Page 260 - ePaper
P. 260
capacity is insufficient (50 – Construction starts PROCUREMENT
80 thousand vehicles a day, 2016 (Potential extension of
over 20 per cent freight public procurement if the
vehicles), while improving Construction ends bidders exercise revision
accessibility to the 2019 procedures) - mitigated
surrounding region that are by: well prepared
gradually becoming documentation for tender.
urbanized. The existing
road surface will be
replaced by cement –
concrete surface, along with
the construction of a,
highway information system
and drainage system. The
section is part of the TEN-T
basic network.
Transportation Corridors and D1 Blatné - Ministry of Transport, Construction involves Yes Obtain relevant 0.36 TBD RISKS OF TECHNICAL
missing links Trnava, Construction and Regional modification of the section’s building permits PROPOSAL
extension to 6 Development of the Slovak parameters in compliance 2015 (Documentation for
lanes Republic with STN standards to Building Permit is
become a satisfactory 6- Launch tender for currently being prepared
lane highway with main construction with the deadline for
emergency lanes that would work handover in January
replace the current 2015 2015).
temporary situation with RISK OF PUBLIC
insufficient capacity (50 – Construction starts PROCUREMENT
80 thousand vehicles a day, 2016 (Potential extension of
over 20 per cent freight public procurement if the
vehicles), while improving Construction ends bidders exercise revision
accessibility to the 2018 procedures); - mitigated
surrounding region that are by: well prepared
gradually becoming documentation for tender.
urbanized. The existing
road surface will be
replaced by cement –
concrete surface, along with
the construction of a
highway information system
and drainage system. The
section is part of the TEN-T
basic network.
Transportation Corridors and D1 feeder Ministry of Transport, The feeder will be Yes Obtain relevant 0.13 TBD TECHNICAL DESIGN