Page 25 - ePaper
P. 25
1
Private /Public
/ Included in Total invest-ment cost Investment in 2015
Sector Subsector PPP Implementing national – 2017
Project name Description investment Status Barriers/solutions
1 includes agency plan
investment by (Yes/No) (EUR bn) (EUR bn)
state-owned
Transport Business private Construction of an integrated The project concerns modernisation of the railway NO In 2015 planned preparation of project 0.02300 TBD Lack of financing
enablers system of safety monitoring PKP SKM w infrastructure on line 250 operated by the Company PKP SKM documentation for the location of:
and information management Trójmieście Sp. z o. o. in the Gdańsk Gdynia Sopot agglomeration. Gdynia Chylonia Rumia Janowo
on the railway line No. 250 in In 2015 plans to prepare project
the Gdańsk-Gdynia-Sopot Under the the project it is planned to design documentation documentation to adapt the platform of
agglomeration, together with and implement tasks the Gdynia Main Station, modernise
modernisation of the a) Adaptation of the platform at SKM Gdynia Main for the Suburban Station, and the space in
Suburban Station building in check in of travelers with reduced mobility and modernisation front of the Station and to create ZSI
Gdynia Main Station and of the Suburban Station Gdynia Główna, Envisaged implementation period 2015-
platforms on the railway line c) Creation of an integrated safety monitoring system and 2023
No. 250 establishment of Monitoring Centre in the Suburban Station
building at Gdynia Main,
d) Modernisation of platform infrastructure located on the
railway line No. 250: Gdańsk Shipyard (passenger stop),
Gdynia Orłowo (station) Redłowo Gdynia, Gdynia Shipyard
(passenger stop), Gdynia Grabowek (passenger stop), Gdynia
Leszczynki (passenger stop ), Gdynia Chylonia (become), in
Rumia Janowo (passenger stop).The works involve inter alia:
- modernisation of the track, along with modernisation of
railway surface and other infrastructure,
- modernization of the platform (the elements of construction,
resurfacing)
- construction of a new / upgrade existing shelters with
lighting,
- modernization of infrastructure of the entrance to the
platform,
- application of solutions for persons with disabilities or
persons with reduced mobility to access the platform
(including the construction of lifts, paths lead to the blind and
visually impaired and markings for the blind and visually
impaired)
- assembly of passenger information system,
i
t f
t ll ti
f t
it
(b
Transport Business private Acquisition of locomotives PKP Linia Hutnicza The acquisition of diesel locomotives h t h ) NO Consideration of alternative options for 0.01784 0.01784 Lack of financing
enablers Szerekotorowa Sp. z with a capacity of more than 3 000 hp that meet the emission locomotives acquisitionm.
o.o. requirements of the environment.
Transport Business private Expansion and management PKP Linia Hutnicza Realizacja zadania obejmuje: NO Preliminary concept works 0.01186 0.00866 Lack of financing
enablers of Hrubieszów Station LHS Szerekotorowa Sp. z 1) the construction of two additional main track of a minimum
(Metallurgic-Sulphuric o.o. length of 792 mb to 111 mb 1,
Railway Line) 2) the construction of two sidings with a minimum
construction length from 504m to 592m, located at the
phytosanitary ramp
3) the construction of two sidings with a minimum
construction length of 692 meter to 792 mb, necessary for
withdrawal of wagons,
4) construction of bilateral phytosanitary ramps length 383 m
with shelter for inner track track No. 21 and No. 23, and with
dehydration,
5) development of electric heating for 16 pcs. Of newly-built
turnouts,
6) the inclusion of newly-built turnouts in control of a
computer system EBILOCK 950,
7) the construction of track lighting pole,
8) the construction of an access road to the ramp
phytosanitary.
Transport Business private Installation of ERTMS in 45 PKP Intercity S.A. Installation of ERTMS in 45 EP09 locomotives, to operate on NO Preparatory stage. 0.01070 TBD Lack of financing
enablers EP09 locomotives, to operate lines upgraded and outfitted with ERTMS In the letter dated 10.09.2013 r. PKP
on lines upgraded and Intercity SA presented a list of projects
outfitted with ERTMS planned for implementation in the 2014-
2020 financial perspective.