replaced by a new section that the only alternate
that will be part of the TEN- source is owned by
T comprehensive network Eustream, which uses it
and that will make the drive to supply water to a
times between the towns of transit gas line
southern and eastern compressor station. It is
Slovakia shorter. The necessary to negotiate
proposed section includes a with Eustreem about
4.7 km long tunnel Soroška. purchasing the water
source or to look for
another water source.)
TECHNICAL DESIGN
RISKS (A feasibility study
IRU WKH 5 7RUQDĐD –
9þHOiUH VHFWLRQ LV XQGHU
preparation.)
PLANNING RISKS (A
feasibility study for the
VHFWLRQ 5 7RUQDĐD -
9þHOiUH LV XQGHU
preparation.)
LEGAL RISKS (to be
treated in the next level of
preparation.)
RISK OF PUBLIC
PROCUREMENT
(Potential extension of
public procurement if the
bidders exercise revision
procedures) - mitigated
by: well prepared
documentation for tender.
Transportation Corridors and R2 Košice, Šaca Ministry of Transport, This section bypasses Yes Obtain relevant 0.40 TBD TECHNICAL DESIGN
missing links - Košické Olšany Construction and Regional Košice to the south and building permits RISKS (A feasibility study
Development of the Slovak diverts both north-south and 06/2016 for the section R2, R4
Republic east-west transit traffic from Prešov - Košice - Bidovce
the city The section is part Launch of tender for DQG 5 9þHOiUH - Košické
of TEN-T comprehensive main construction Olšany is under
network and it links the R2 work preparation)
and R4 expressways with 10/2016 PLANNING RISK (As
the D1 highway. It will required by Košice, the
relieve the traffic in Košice, Construction starts higher territorial unit of the