through intersections in the 2015 by: well prepared
city that are insufficient in documentation for the
terms of capacity, causing Construction starts tender.
regular congestion. The 12/2015
share of freight traffic in this
section is 25 per cent. The Construction ends
proposed section is part of 12/2019
the basic TEN-T network. It
should improve the
environment.
The following 5 highway sections are currently under construction with co-financing from European Union resources - Operational Programme Transport 2007 – 2013. Since construction has overrun the 2007-2013
programme period, they are considered so-called “phase projects” and will be co-financed also from the Operational Programme Integrated Infrastructure 2014 – 2020.
Transportation Corridors and D1 Lietavská Ministry of Transport, The most anticipated Yes Obtain relevant 0.36 TBD TECHNICAL DESIGN
missing links /~ÿND - 9LäėRYp Construction and Regional highway construction will building permits RISKS (Borne by the
- Dubná Skala Development of the Slovak relieve the burden of 25 - 29 04/2009 contractor (Yellow FIDIC))
(2 stage) Republic thousand vehicles a day on LEGAL RISKS
nd
, URDG DW 6WUHþQR RI Launch tender for (Minimum). Settlement of
which the freight main construction property rights in progress
transportation is work (96 per cent and 85 per
approximately 26 per cent. 12/2011 cent), it is necessary to
The exceeded capacity of settle property rights to
this road has contributed to Construction starts lands of unknown and
the deterioration of two 03/2015 newly discovered owners)
Level VI bridges in this - mitigated by: well
section, so classified due Construction ends prepared documentation,
to their structural 12/2019 sufficient communication
engineering condition. Black with owners, forcing the
spots are identified in this cooperation with the
section of Route I/18 , appropriate bodies,
where the accident rate is professionalism of the
0.96 accident per km in the contracting authority´s
region and there is a risk of team.
landslide and falling rocks in
spite of barriers that have
been built. The proposed
section is part of the basic
TEN-T network. The section
will include the 7,5km long
9LãĖRYp WXQQHO
Transportation Corridors and ' +ULÿRYVNp Ministry of Transport, This section is the Yes Obtain relevant 0.29 TBD TECHNICAL DESIGN
missing links Podhradie - Construction and Regional beginning of the southern building permits RISKS (Borne by the
/LHWDYVNi /~ÿND Development of the Slovak bypass of Žilina that will 11/2008 contractor (Yellow FIDIC))