/ Included in Total invest-ment cost Investment in 2015
Sector Subsector PPP Implementing national – 2017
Project name Description investment Status Barriers/solutions
1 includes agency plan
investment by (Yes/No) (EUR bn) (EUR bn)
state-owned
Transport Corridors private Works covering the PKP Polskie Linie Yes The feasibility study tender is to be 0.15369 TBD Lack of financing
and Bydgoszcz Główna - Piła Kolejowe S.A. announced in the first half of 2015.
missing Główna - Krzyż section of
links railway line no. 18 and 203;
stage 2: works covering the
Piła Główna - Krzyż section,
incl. electrification
Transport Corridors private Works covering the Skawina PKP Polskie Linie Yes Procedure of selecting contractor to 0.14281 TBD Lack of financing
and – Sucha Beskidzka – Kolejowe S.A. prepare a feasibility study (FS).
missing Chabówka – Zakopane
links section of railway lines no.
97, 98 and 99, including the
construction of line
connecting Sucha Beskidzka
and Chabówka
Transport Corridors public Construction of the KZGW and RZGW in Yes TDS 0.12500 TBD due to lack of funds, it is impossible to build the
and Niepołomice barrage on Kraków barrage, which would extend the existing class 4
missing upper Vistula waterway on upper Vistula.
links
Transport Corridors private Works covering the Oleśnica PKP Polskie Linie Yes Initial conceptual work. 0.09458 TBD Lack of financing
and / Łukanów – Krotoszyn – Kolejowe S.A.
missing Jarocin – Września –
links Gniezno section of railway
lines no. 281 and 766
Transport Corridors private Works covering the PKP Polskie Linie The line is part of the core network and an element of the Yes Initial conceptual work. 0.08323 TBD Project included in the implementation document
and Czechowice Dziedzice – Kolejowe S.A. Baltic – Adriatic Corridor (ID) on the Connecting Europe Facility (CEF) list.
missing Bielsko Biała – Zwardoń The call is competitive and obtaining funding is
links (national border) section of not certain.
railway line no. 139
Transport Corridors private Works covering the PKP Polskie Linie Yes The feasibility study tender is to be 0.08276 TBD Lack of financing
and Bydgoszcz Główna - Piła Kolejowe S.A. announced in the first half of 2015.
missing Główna - Krzyż section of
links railway line no. 18 and 203;
stage 1: works covering the
Bydgoszcz Główna - Piła
Główna section
Transport Corridors private Works covering the Stalowa PKP Polskie Linie Yes Initial conceptual work. 0.08110 TBD Project included in ID on the Operational
and Wola Rozwadów - Przeworsk Kolejowe S.A. Programme Development of Eastern Poland
missing section of railway line no. 68 (EPD OP) list. Obtaining funding is not certain.
links Yet, the project should first and foremost be
financed from EPD OP.
Transport Corridors private Works covering the PKP Polskie Linie Trans-border section of a railway line belonging to the TEN-T Yes The feasibility study tender is to be 0.07566 TBD Lack of financing
and Kamieniec Ząbkowicki – Kolejowe S.A. comprehensive network, connecting Poland and the Czech announced in the first half of 2015.
missing Międzylesie section of railway Republic
links line C-E 59
Transport Corridors private Construction of a deepwater Szczecin and Yes TDS 0.07500 TBD Lack of funding
and quay in the external harbour Świnoujście Seaport
missing in Świnoujście Authority S.A.
links