Energy Connections and private Super Quick Gas GSCeP, a.s. Cavity natural gas storage with a No Pre-project phase, 0,240 0.075 The uncertainity in predictions of the future
Union production (gas Storage target volume of 180 mcm (could exploratory works are (related to industry‘s development and related
storage) be updated) located in an close to completion. the complications in a calculation of the
extraordinary convenient Construction of the capacity potential investment returns („an
geological magmatic bedrock. gas storage is of 180 inconsistency of the environment“) is
These conditions anable involved in „The Plan mcm), considered as the main obstacle.
injection/withdrawall using an of the Regional based on
operating pressure up to 30 Mpa Development“ the
(1 complete injections/withdrawall (Document approved current
cycle takes 20 days.) The gas by the Government of estimates
storage is built up in the area of the Czech Republic).
the current uranium mine (which
activity is declining) in Dolní
Rožínka.
Energy Connections and private Gas Pipeline České 100 km of the high pressure No A study completed. 0.075 0.075 The uncertainity in predictions of the future
Union production (gas „Mozart“ plynovody, a.s. transit gas pipeline connecting the Involved in „The Plan industry‘s development and related
industry) connecting the southern line of NET4Gas with of the Regional complications in a calculation of the
Czech and Austrian WAG - cross-border Development“ potential investment returns („an
Austrian gas project. (Document approved inconsistency of the environment“) is
systems. A by the Government of considered as the main obstacle .
project of the the Czech Republic).
cross-boarder
cooperation.
Energy Connections and private Electric Energy GSCeP, a.s. Electric Energy Storage based on No Involved in „The Plan 0.036 0.036 The uncertainity in predictions of the future
Union production Storage (CAES use of the compressed air of the Regional industry‘s development and related
(electric energy Technology) (Adiabatic Compressed Air Development“ complications in a calculation of the
storage) Energy Storage: A-CAES), target (Document approved potential investment returns („an
output 60 MW in 40 hours, start by the Government of inconsistency of the environment“) is
up in 5 minutes. the Czech Republic). considered as the main obstacle
Energy Connections and private Construction of ČEPRO, a.s. Construction of product pipeline No Secured planning 0.02 0.0013 Property purchase. Financing of the
Union production the pipeline 50 km length, connecting fuel permission, ongoing project.
(Petroleum Loukov - storages of the company Loukov solutions of property
refining industry, Sedlnice u Kroměříže – Sedlnice u relations - provided
Transportation, Mošnova. 90% of the rights to
Storage of the land in question.
automotive fuels)
Energy Connections and private LNG ČEPRO, a.s. Construction of natural gas No Pending investment 0.043 0.043 Development of the LNG market in the
Union production cryogenisation unit, installation of plan is prepared field of automobile transport.
(Petroleum technology that allows dispensing (Business Case).
refining industry) of LNG / CNG at filling station
network of the company.