Energy Connections and private STORK II NET4GAS, Project is part of the cross-broder Yes EIA is Issued. 0.086 0.018 There are regulatory barriers – there are
Union production (gas s.r.o. North - South Gas Corridor, Preparation LPD. not defined rules for the next regulatory
industry) submitted by the Members of V4. period. The length of the regulatory
Project of the construction the period versus (5 years) return on
second CZ-PL interconnection. investment (50-60 years) is a large
The goal is to ensure safe and investment risk. Lack of financing
reliable transit of gas between investment opportunity based on market
these two countries. The new mechanism.
pipeline will allow the increase of
transmission capacity between
the two countries. Construction
will allow flexible transport of gas
in Central Europe, ensure
diversification of sources. The project has
gained PCI status
under Regulation
347/2013.
Energy Connections and private MORAVIA NET4GAS, Project is part of the cross-broder Yes EIA is issued. LPD 0.26 0.09 not defined rules for the next regulatory
There are regulatory barriers – there are
Union production (gas s.r.o. North - South Gas Corridor, presented at the
industry) submitted by the Members of V4. MRDR. Continue period. The length of the regulatory
In combination with the project preparatory work, period versus (5 years) return on
Stork II the project will support the including investment (50-60 years) is a large
development of the North-South archaeological investment risk. Lack of financing
connection. The project means survey. investment opportunity based on market
also strengthening the security of mechanism
gas supply for Moravian regions
and increase transport capacity
for northern Moravia.
Exacting and complex technical
Energy Connections and private OPTIMUS NET4GAS, The program of modernization of No, it is Project preparation 0.037 0.032 solutions, The cost which are given by
Union production (gas s.r.o. compressor stations Kouřim and the and realization of sub
industry) Břeclav: fulfilment the emission reinvestm projects are the requirement to sustain the
limits, energy efficiency, safety ent to underway. transmission capacities for period of
operation, long – distance sustaining realization, Difficult economic evaluation
management of dispatching. the of the project because of geopolitical
existing factors and regulatory environment,
capacity especially after 2020.
of the gas
transmissi
on system
Energy Connections and private ONI NET4GAS, Building the bidirectional Yes EIA under preparation 0.144 0.065 not defined rules for the next regulatory
There are regulatory barriers – there are
Union production (gas s.r.o. interconnections between the
industry) Czech Republic and Austria. The period. The length of the regulatory
goal is a safe and reliable period versus (5 years) return on
transport of gas between the two investment (50-60 years) is a large
countries. The construction allows investment risk. Lack of financing
flexible transmission of gas in investment opportunity based on market
Central Europe and increase mechanism.
security of supply and
diversification of sources. The
project gained PCI status under
Regulation 347/2013.
Energy Connections and Construction of 2 MERO ČR, a.s. Increase of storage capacity for Valid building permit 0.045 0.045 Insufficient financial resources.
strategic stock (including potential
Union production oil storage tanks and prepared
with the volume diversification of oil types) and implementation
of 125 thousand increase of handling volume in the project.
m each at CTR periods of regular tank outages.
3
Nelahozeves.