Page 91 - ePaper
P. 91
1
Private /Public
/ Included in Total invest-ment cost Investment in 2015
Sector Subsector PPP Implementing national – 2017
Project name Description investment Status Barriers/solutions
1 includes agency plan
investment by (Yes/No) (EUR bn) (EUR bn)
state-owned
Resources Natural public private Syngas Generating Plant ORLEN Eko Co. Ltd. Syngas Generating Plant out of MSW and industrial waste No Performed Feasibility Study, received 0.07500 0.07500 Considerable investment risks resulting from:
and resources: Trzebinia/Chrzanow Memeber of ORLEN based on gasification technology and/or gasification with use Environmental Decision and and Innovative technology in world scale (few
Environme efficient group of plasma. Decision of Public Goal Investment. installations of comparable scale and solutions
nt and secure Product in form of syngas planned to be utilizedas the fuel as Actually detailed economical analisys all over the world - only one in Europe).
availability substitute of natural gas or other natural resources. are undertaken. Internal corporate High cost of investment at long term return
No emission and na waste technology (remains after process decisions are proceeded. period and necessity to provide uninterrupted
in form of vitrificate is bulding material) stream of waste in long period of time.
Technology environment friendly (contrary to classical waste
incineration plants).
Resources Natural public private Syngas Generating Plant ORLEN Eko Co. Ltd. Syngas Generating Plant out of MSW and industrial waste No Feasibilty study performed. 0.07500 0.07500 Considerable investment risks resulting from:
and resources: Plock Memeber of ORLEN based on gasification technology and/or gasification with use Prepared application for Environmental Innovative technology in world scale (few
Environme efficient group of plasma. Decision. installations of comparable scale and solutions
nt and secure Product in form of syngas planned to be utilizedas the fuel as Detailed economical analisys in all over the world - only one in Europe).
availability substitute of natural gas or other natural resources. progress High cost of investment at long term return
No emission and na waste technology (remains after process period and necessity to provide uninterrupted
in form of vitrificate is bulding material) stream of waste in long period of time.
Technology environment friendly (contrary to classical waste
incineration plants).
Resources Natural public private Extension of the value chain Trzebinia Refinery Building new plant for bio-products production No Preparing pre-feasibility study for 0.03500 TBD Lack of financing for building plants for
and resources: for biodiesel products investment implemented technology. Financing available
Environme efficient only for building plants for non-implemented
nt and secure technology
availability
Resources Natural public private Recovery of rare earth National Fund for No Conceptual phase 0.00200 0.00200
and resources: metals Environmental
Environme efficient Protection and Water
nt and secure Management, Ministry
availability of Env.
Resources Resilience public private EU steel industry Minister of Economy The EU steel industry is in retreat. More and more blast No Analytical and design phase 2.00000 0.33000
and to Climate revitalisation program /Agencja Rozwoju furnaces are closed. The high-emission blast furnace
Environme Change Przemysłu SA production is replaced by even more high-emission imports.
nt The modernisation programme for the EU's steel industry
could reverse this unfavourable process. At the same time, a
complementary industrial use of blast-furnace gas and coke-
oven gas would be possible, along with the development of
the related industries. The European automotive industry
would be improved by a stronger base of competitive
development in relation to Asian and American industry.
Resources Resilience public private Ecological heating Ministry of the Replacing the conventional coal-fired stoves by environmental No Conceptual phase and experiences 1.00000 1.00000
and to Climate Environment, National friendly and safe (to lower the level of pollution). One element from programmes financed by
Environme Change Fund for of the project will support the production of such installations NFEPWM
nt Environmental in Poland using best practice and technology and research on
Protection and Water innovation in this area.
Management,
Voivodship Funds for
Environmental
Protection and Water
Management
Resources Resilience public private Ecological vehicles in cities Ministry of the Set up the sufficient urban infrastructure for ecological fleet YES Conceptual phase and experiences 1.00000 1.00000 Biurocratic burdens
and to Climate Environment, National (charging stations, the rental system, hybrid and electric from foreign projects (know-how
Environme Change Fund for vehicles, public transportation using such power sources as transfer from e.g. Paris)
nt Environmental gas, hybrid, electricity)
Protection and Water
Management,
Voivodship Funds for
Environmental
Protection and Water
Management
Resources Resilience private Building new waste water Trzebinia Refinery Building new waste water treatment plant with division wastes No Administrative permits, contractor 0.00750 0.00750 A lack of possibility for financing for building
and to Climate treatment plant on process wastewater and raining wastewater. selection procedure (EPC) plants for implemented technology
Environme Change
nt






Seite 45 von 52
   86   87   88   89   90   91   92   93   94   95   96