sufficient communication
with the owners,
cooperation with the
competent bodies,
professionalism of the
sponsor´s team.
RISKS OF PUBLIC
PROCUREMENT AND
CONTRACT (Potential
extension of public
procurement if the bidders
exercise revision
procedures) – mitigated
by: well prepared
documentation for the
tender.
Currently, construction of part of highway bypass of Bratislava – capital city of the Slovak Republic – is being prepared – . Once it has been completed, the highway bypass will connect Austrian highway A6 on the
south and to Austrian expressway S8, which is being prepared for the north-west. Once the highway opens, it will take over a major part of traffic transiting from core Baltic - Adriatic and Rhine –Danube TEN-T
corridors that go through Bratislava. Highway D4 will be constructed together with the first part of Expressway R7, to be the southern link between western and central parts of Slovakia as one project, since a complex
transportation solution is needed in the concerned locality. Construction of the D4 and R7 highways is planned in a form of a DBFOM model public-private partnership The project under preparation consists of the
following sections:
Transportation Corridors and D4 Bratislava Ministry of Transport, The Bratislava south- Yes Obtain relevant 1.35 TBD RISK OF PUBLIC
missing links Jarovce – Ivanka Construction and Regional eastern bypass is an building permits PROCUREMENT
pri Dunaji North Development of the Slovak essential section of D4 05/2016 (Potential extension of
- 5DÿD Republic highway to divert transit public procurement if the
traffic, relieve the congested Launch tender for bidders exercise revision
D1 section including concessionaire procedures) – mitigated
Prístavný most (bridge) 12/2014 by: well prepared
(traffic intensity over documentation for the
100,000 vehicles a day with Construction starts tender.
assumed increase to 06/2016 PROPERTY RIGHTS
140,000 vehicles in 2020) SETTLEMENT RISK
and improve transport Construction ends (potential extension of the
connections to villages in a 06/2019 period to obtain building
suburban zone surrounding permit due to
Bratislava. Construction condemnation,
includes a 2.5 km long cooperation of
bridge over the Danube. appropriate bodies, etc.) –
mitigated by: well
prepared documentation,
sufficient communication
with owners, forcing the


17