Page 170 - ePaper
P. 170
Sheet1
New thermal power
production capacity Establishing of a database for National Fund of Geological data and
Connections based on natural gas Energy Information from existing records and digital information on oil and gas Develop the
Energy Union Private within SE Craiova II No 25.60 14.50 Cash-flow deficit
and stage CT black oil to Complex and mineral resources (energetic and non-energetic), in an design
production Oltenia international standard open system, and support software documentation
provide the thermal
power after the closure
of IMA 23 and 4


Connections Energy The investment is required to comply with the environment requirements
Energy Union Private Limestone grinding plant No About to be initiated 20.00 20.00 Cash-flow deficit
and Complex of the European legislation
production Oltenia
Connections Jilt - Turceni Coal Energy The investment is required to comply with the European Community
Energy Union Private No About to be initiated 100.00 100.00 Cash-flow deficit
and Conveyor Belt Complex Energy Policy
production Oltenia

Connections Flue Gas Energy The investment is required to comply with the environment requirements
Energy Union Private Desulphurisation Plant - No In course of being 41.00 41.00 Cash-flow deficit
and Power Unit No. 5 - Complex of the European legislation started
production S.E. Rovinari Oltenia

Rehabilitation and
Connections modernization of Energy The investment is needed to comply with the environment requirements
Energy Union and Private energy block 5 of 330 Complex of the European legislation Yes Investment is underway 168.25 168.25 Cash-flow deficit
production MW, on lignite - SE Oltenia
Rovinari
NOx Reduction Plant at
Energy Union Connections Private Power Units No. 4,5 and Energy The investment is needed to comply with the environment requirements No About to be initiated 26.50 26.50 Cash-flow deficit
and 6 - Complex of the European legislation
production SE Ro inari Oltenia

Connections Rehabilitation and Energy The investment is needed to comply with the environment requirements
Energy Union Private Modernisation of Power No About to be initiated 446.35 446.35 Cash-flow deficit
and Units No. 3 and 6, 330 Complex of the European legislation
production MW - S.E. Oltenia
Turceni
Reduction of nitrogen
Energy Union Connections Private oxide emissions at 1035 Energy The investment is needed to comply with the environment requirements No About to be initiated 26.90 26.90 Cash-flow deficit
and t/h Boilers No. 3, 4 and 5 Complex of the European legislation
production SE Turceni Oltenia SA

Connections Rehabilitation and Energy The investment is needed to comply with the environment requirements
Energy Union Private modernization of energy Yes Investment is underway 32.35 25.15 Cash-flow deficit
and block 7 lignite SE Complex of the European legislation
production Oltenia SA
Işalniţa
Connections Reduce NOx emissions Energy The investment is needed to comply with the environment requirements
Energy Union Private No About to be initiated 26.00 26.00 Cash-flow deficit
and at blocks 7 and 8, SE Complex of the European legislation
production Işalniţa Oltenia SA
Modernize the system
Connections used to reduce nitrogen Energy The investment is needed to comply with the environment requirements
Energy Union Private No About to be initiated 10.00 10.00 Cash-flow deficit
and oxides emissions (NOx) Complex of the European legislation
production SE Craiova II Oltenia SA
Put the technological
load- free land plots of
Energy Union Connections Private the Mining Division Energy The investment is needed to comply with the environment requirements No About to be initiated 3.80 3.80 Cash-flow deficit
and Branch back into the Complex of the European legislation
production Oltenia SA
economic circuit


Mining technological The intention is to purchase high-performing equipment to allow the
Connections equipment to enable the Energy development, the safe use and the efficiency improvement. Work flows Procurement documents
Energy Union Private extraction of hard coal will be provided starting with prospection - development, use, transport No 60.00 60.00 Cash-flow deficit
and from Jiu Valley to Complex and sorting of coal. Another equipment category helps improving the are being drafted
production increase the availability Hunedoara safety and efficiency by capturing the pit gas (CH 4), recovering the coal
and efficiency under
safety conditions from dumps and sludge beds.


Mining technological
equipment to enable the
Connections extraction of hard coal Energy The purpose is to purchase performing equipments to allow the Procurement documents
Energy Union Private No 60.00 60.00 Cash-flow deficit
and from Jiu Valley to Complex generation of gas by the distillation of underground are being drafted
production increase the availability Hunedoara coal.
and efficiency under
safety conditions

Installed Power: 1,723 MW;
Power output: 2.140 Works have been
Photovoltaic Park with MWh/year; started to execute the The main reason why the project implementation has not been
Net updated income (NAI): 1,893 thousand photovoltaic park, completed so far is that Electrocentrale Grup S.A. started
Connections installed capacity of operating in March 2013, and the decision regarding the
Energy Union Private 1.723 MW, in Electrocentrale Grup EUR; Internal Rate of Return: (IRR): 12.23 No including the two 3.220 3.220
and Chiscani, Braila % stages: investment objective was enforced in October 2013. In
production County”; Updated Recovery Time: (URT): 9.33 years; design/engineering and addition, the development vision so far has not considered a
Priority project Investment cost: 2,594.352 thousand EUR, exclusive of cosntruction, assembling new production capacity with a new and modern technology
VAT; and commissioning and specifically low costs.
Specific value/MWh: 1 505 718 thousand
Page 15
   165   166   167   168   169   170   171   172   173   174   175