Select investors for the purpose of building new power groups, with a tri-
generation technology and an installed capacity which will be
determined by a feasibility study; The main reason why
Installed power: 1 MW the project has not The main reason why the project implementation has not been
been implemented so
Carrying out of new power Efficiency on a tri-generation contour: far is that completed so far is that Electrocentrale Titan S.A. was set up
units located on Titan 90% Electrocentrale Titan on September 30,2014, and the final decision on the
Energy Union Connections Private Power Plant site, Electrocentrale Grup specific investment value (network included):1200 No S.A. was established 1.20 0.90 investment project will be enforced after the presentation of
and belonging to Euro/kWi Number of operating hours: 8000 ore/an in September 30, the feasibility study approved according to legal requirements.
production “Electrocentrale Titan” Review time: 21 2014, and the final In addition, the development vision so far has not considered
S.A.- Trigeneration years Useful life: 20 decision on this a new production capacity with a new and modern technology
capacities; years investment project was and specifically low costs.
Total realization time: 1 year
applied after the
Natural gas price: 325 $ / 1000 cubic presentation of the
meters
Electricity sale price: 45(yr 1)÷60(yr 20)EUR/MWh feasibility study
Thermal energy sale price: 40(yr 1)÷45(yr


Investments in the plant consisting in performing co-generation
Match the electricity and installations, formed of gas-turbin, reservoir and steam turbin aimed at
thermal power output to
Connections the consumption needs Electrocentrale boosting economic efficiency and improving the environment conditions At this time, the The lack of financing and of an investor / find funding, partners
Energy Union Private by improving the plant's operating efficiency. The feasibility study Yes feasibility study and and 62.50 62.50 and a firm contract for the supply of thermal power with the
and in the context of reducing Galati shows an optimal equipping version for a new energy capacity formed the bancable document municipality at least for the time of recovering the investment.
production own consumption and Company SA of: 1 gas-turbin of 30 MW; 1 steam producing reservoir for are ready.
production expenses;
recovery (60 bar(a); 470 °C); 1 steam-turbin of 10 MW.


Purpose: the need to have ELCEN units equipped with state-of-the-art
thermal power producig installations working on gas, complying with the

polluting emissions regulations under the legislation in force, including
Directive 2010/75/UE to become effective in 2016, introduced in the
Romanian legislation by the adoption of Law 278/2013 on industrial
emissions.
Reengineering of hot Objective: provide the thermal power needed by the Centralized Thermal
water boiler (CAF) nr. 1 Power Supplier System (SACET) of Bucharest Municipality under safe
Connections – 100 Gcal/h of CTE Societatea circumstances, conitnuity of supply and compliance with the environment The feasibility study
Energy Union Private Electrocentral No 10.00 10.00 Difficulties in getting the financing.
and Bucharest West and the e Bucureşti requirements, in particular to cover the maximum thermal power needed was developed.
production hot water boiler nr. 4 – S.A. in wintertime.
100 Gcal/h of CTE •Duration: 12 months.
Grozăvești. •Implementation: QI 2015 – QII 2016.
•Other feasibility
indicators: a)CAF nr. 1 –
CTE West
IRR (internal rate of return):
14.66% RT (recovery time): 9.31
years. b)CAF nr. 4 – CTE
Grozăvești

•Purpose: the need to comply with the European and MS policy and
strategy on the need to cover the electricity demand with a market in
process of liberalization, which involves the increase of energy
efficiency, economic efficiency, as well as reduced greenhouse gas

emissions by promoting highly efficient cogeneration systems.
Co-generation unit in a •Objective: cover the thermal power demand for the Centralized Thermal The legislation in the field of highly efficient co-generation is
Energy Union Connections Private mixed cycle with gas Electrocentral Power Supplier System (SACET) of the Bucharest Municipality under Yes The feasibility study 64.48 64.48 not attractive enough to investors involved in the project
and generator engine in e Bucuresti safe circumstances, provided the continuity of supply and compliance was developed. implementation together with ELCEN
production CTE Grozăvești S.A. with the environment requirements.
•Time of completion: cca. 36 months.
•Implementation time: 2015-2017.
•Other feasibility indicators:
-IRR(internal rate of return): 15.46%
-RT (recovery time): 9 years.

With the feasibility study
endorsed by the
Directorate Decision
A new line 400 kV double circuit (equipped circuit) between the 260/2013, the project is
Connections LEA 400 kV double existing stations - Smardan and Gutinas - with a length of now in the stage of The lack of funds may lead to delays in the project
Energy Union Private Transelectrica Yes 65.00 8.00 implementation. A mix of European financial assistance in
and circuit Smardan - around 140 km. obtaining the necessary the form of a grant or in financial instruments may be
production Gutinas Transport capacity increase between the western coast of the permits. considered.
Black Sea (Dobrogea Region) and the rest of the inter- Estimated time of
connected system. commencement:
2016. Estimated
ti
lti
f
The feasibility study
approved by the decison
of the board nr.7/2010,
A new line 400 kV cimple circuit between existing stations - Suceava the project is in the
Connections LEA 400 kV simplu and Gadalin - of around 260 km. stage of obtaining the The lack of funds may lead to delays in the project
Energy Union Private Transelectrica Increase of the transport capacity between the production centre Yes 95.00 12.00 implementation. A mix of European financial assistance in
and circuit Suceava - coming from wind energy in the Eastern Region of Romania and the necessary permits. the form of a grant or in financial instruments may be
production Gadalin estimated time of
rest of the inter- connected electric and enrgy system. considered.
commencement –
2017. estimated time
of


Page 16