Page 99 - ePaper
P. 99
Energy Union Energy Comptintel ORES Progressive implementation Yes Planning in 0,22
Regulated efficiency in of Smart Meters in the final stages
Activities buildings Walloon Region and regulatory
(public decision needs
sector & to be taken–
others) pre-
deployment
start expected
in 2016-2018.
Full roll out
expected from
2019
Energy Renewable On-shore and Development of On- and Off-Yes In progress 0,56
Production Energy off-shore wind shore wind farms (Norther
Production farms 600M/3 years -> costs
increase in 2016
Energy Sport Pool Plan Infrasports Modernizing the Walloon Yes Renovation or 0,13 Lack of ressources +
Infrastructur (Public service pools -the majority of them replacement of ESA borrowing limit
e of Wallonia) was built in the 70s. They 41 sites
are energy consumming.
Wallon goals , in
partnership with local
entities are: • Sustaining the
park use to the public
(leisure and health);
• Reducing energy
consumption by replacing
lighting systems, building
insulation and widespread
cogeneration;
• Improving the
environmental impact and
the users health by replacing
the systems water treatment
and air;
• Creating jobs through
playful pole side
development
BRUSSELS REGION 7,026 3,353
TRANSPORT 2,883 1,249
Regulated efficiency in of Smart Meters in the final stages
Activities buildings Walloon Region and regulatory
(public decision needs
sector & to be taken–
others) pre-
deployment
start expected
in 2016-2018.
Full roll out
expected from
2019
Energy Renewable On-shore and Development of On- and Off-Yes In progress 0,56
Production Energy off-shore wind shore wind farms (Norther
Production farms 600M/3 years -> costs
increase in 2016
Energy Sport Pool Plan Infrasports Modernizing the Walloon Yes Renovation or 0,13 Lack of ressources +
Infrastructur (Public service pools -the majority of them replacement of ESA borrowing limit
e of Wallonia) was built in the 70s. They 41 sites
are energy consumming.
Wallon goals , in
partnership with local
entities are: • Sustaining the
park use to the public
(leisure and health);
• Reducing energy
consumption by replacing
lighting systems, building
insulation and widespread
cogeneration;
• Improving the
environmental impact and
the users health by replacing
the systems water treatment
and air;
• Creating jobs through
playful pole side
development
BRUSSELS REGION 7,026 3,353
TRANSPORT 2,883 1,249