(solar, biomass, heat in 2015/16. external capacities is available.
pumps, wind and their Construction:
combinations) to cover 2017. Coordination and permitting
local needs. 3 projects problems, leading to possible
per region (total 24 delays / a structure for projects
projects). Each project advisory and supervision is needed
serves also as a (e.g. covered by SIEA or
demonstration of consortium of government and non-
principles of intelligent government agencies).
energy: community
ownership, energy Lack of funds for project
efficiency, local energy preparation / costs sharing models
autonomy and with partners to be considered.
environmental
sustainability.

Energy Union Energy Ultra-energy- CLUSTER of Local Pilot reconstruction of No To be planned. 0.140 0.140 Lack of experienced designers of
efficiency in effective public and regional public facilities in Expented buildings that are to meet the
buildings buildings: municipalities, PPP regions (especially rural) planning and criteria / training program for
regional that respect the permitting phase: designers + regional/national
penetration of following principles: in 2015/16. register of high profile designers
strict EU energy complex thermic Construction: and suppliers are recommended.
efficiency policy insulation combined with 2017.
effective energy system Permitting problems / training for
and operation after representatives of potential
reconstruction, low-cost municipal beneficiaries is neede.d.
reconstruction based on
maximum use of natural Lack of funds for project
materials, optimal preparation / costs sharing models
utilization of the facility with partners to be considered.
after reconstruction,
incorporation of
demonstration/education
elements to promote
buildings reconstructed
into ultra-energy-
effective standard. Up to
50 public facilities per
region: total 400
facilities.