import of natural gas from third reprocessing of risk of initial research.
countries. Gas reservoirs were seismic data in the
discovered and mined in the pre- Závod area realized
Neogene of the Vienna basin in in 2006.
the volume of approx. 1.6 bn. m 3
of natural gas, but reservoirs in The study of drill
dozens of bn m of natural gas cores from the core
3
were discovered in the pre – warehouse of
Neogene of the Austrian part of NAFTA a.s.
the Vienna basin. It is expected realized.
that such deposits also occur in
the Slovak part of the Vienna Measurement of 2
basin and in the Eastern Slovak magnetotelluric
Lowlands. At the beginning of this profiles realized.
project, it is necessary to precisely
identify and localize hydrocarbon
traps using 3D seismic
measurements. After interpreting
the results of measurements, the
identified sites will be opened. At
the same time, tendering to drill
10 bore-holes will be prepared. In
2017, the opening of potential
sites will take place.

Main project lines:


- 3D seismic
measurement over an
area of approx. 300 km 2
- Drilling of 10 bore-holes



Energy Union Low-carbon Use of NAFTA a.s. The project aims at using N/A Project developed – 0.053 0.053 High investment
energy geothermal geothermal energy for electricity hydro-geological expenses linked to the
production and energy generation. It will be the first survey to acquire risk of initial research.
integration into geothermal power plant in thermal water Insufficient support by the
the network Slovakia. In total, the project regulator.
includes a survey of the area – 3D
seismic, magnetotellurics. Drilling
of 4 geothermal bore-holes and
building of the geothermal power



12