Page 235 - ePaper
P. 235
minimum

Energy Union Interconnectio Energy-efficient U. S. Steel Košice, Rolling mill drive NA Study 0,1 0,02 High capital
n and Rolling s.r.o. upgrade; electric power expenditures
Production conservation

Energy Union Low-carbon Automotive High- U. S. Steel Košice, Construction of NA Study 0,5 0,05 High capital
Energy strength Steel s.r.o. continuous steel expenditures
Production Production casting facilities to
produce high-strength
steel grades at the
lowest possible energy
demand


Energy Union Low-carbon Galvanizing Line U. S. Steel Košice, Construction of facilities NA Study 0,14 0,05 High capital
Energy Construction s.r.o. producing galvanized expenditures
Production sheets as the main
product for the
automotive industry as
well as a substrate for
construction industry
products to minimize
the energy demand of
buildings




Energy Union More energy- Improving the DUSLO, a.s. Support for the use of The project is at 0,066
efficient energy efficiency highly effective the stage of
low-carbon of electricity and combined electricity and selecting the
economy heat generation heat generation based general supplier.
PPC DUSLO 67 on demand for usable The general
MWe heat. supplier will also
secure the project
documentation.







Energy Union Connections Pilot regional CLUSTER of Local Model regional priority No To be planned. 0.240 0.200 Lack of capacities for regional
and intelligent energy and regional projects of decentralized Expented energy planning + absence of
production schemes municipalities, PPP energy generation from planning and energy strategies / support for this
local renewable sources permitting phase: area by EC grants is envisaged +

14
   230   231   232   233   234   235   236   237   238   239   240