Sector Subsector Private/Pu Project name Implementing Description Included in Status Total Investment Barriers/solutions
blic/PPP agency national invest- in 2015 –
investment ment cost 2017
plan
(yes/no) (EUR bn) (EUR bn)

Energy Union Connections private European GWp Fab for Private Strategic project to bolster the European Fab-layout and production upgrade 0.0 0.0
and production Advanced Cell Technologies Solar Cell manufacturing industry thus measures defined and ready for
(Scenario 1) preserving a domestic European PV- implementation.
industry. The project would accelerate the
commercialization of high-efficiency solar
cells.

Energy Union Connections private European GWp Fab for Private Strategic project to bolster the european Fab-Layout and production upgrade 0.2 0.2 The remaining, cash-strapped european
and production Advanced Wafer, Cell and PV-module manufacturing industry thus measures defined and ready for industry lacks liquidity for investing in
Module Technologies preserving a domestic european PV- implementation next-generation technologies for Wafer-,
(Scenario 2) industry. The project would accelerate the Solar Cell and PV-module processing.
commercialization as well as the testing Funding would support the Capex
of innovative PV-modules and systems necessary for implementing novel
technologies thus re-gaining technology
lead
Energy Union Connections private xGWp – European Gigawatt Fraunhofer Institut f. Highly efficient photovoltaic products with No 2015: establishment and full use of 0.6 0.6 lack of long-term financing
and production Fab Solare two production sites: one cross-border capacity for 90 MW p/a
Energiesysteme ISE France - Baden Württemberg and one 2017: expansion of up to 1,000 MW
cross-border Netherlands - NRW p/a
Energy Union Connections public Haitabu Federal level LNG-Terminal incl. regasification for No Conception and planning; part of the 1.0 0.6 Lack of short term roi will lead to
and production private vessels up to 150,000 m3; capacity of strategic decision that probably will to financing problems. A combination aof
about 6 to 8 bcm. Storage capacity would be felled in 2015; EC grants, EIB and special national
be 300,000 m3. The terminal would be regulation could overcome these
important for our straregic orientation to problems.
diversify sources and infrastructure for
the supply of natural gas. The terminal
could be a key project on the path of
achieving a less vulnerability in energy
supply by too little gas producing
countries. It is not only important for the
security of supply in Germany but also in
the neighbouring countries that are
connected by pipelines with Germany.

Transport Corridors and public BAB A1/A30 (Highway) Federal level A 1 AS Münster/Nord – AK anounced (not yet in tender) 0.5 0.1 administrative barriers
missing links private Lotte/Osnabrück und A 30 AS Rheine –
AK
Transport Corridors and public BAB A44 (Highway) Federal level A 44 Diemelstadt – Kassel/Süd anounced (not yet in tender) 0.1 0.0 administrative barriers
missing links private
Transport Corridors and public BAB A6 (Highway) Federal level A 6 Wiesloch-Rauenberg – AK in tender 0.5 0.1 administrative barriers
missing links private Weinsberg
Transport Corridors and public BAB A61/A650/A65 Federal level A 61 Landesgrenze Rheinland-Pfalz / anounced (not yet in tender) 0.2 0.1 administrative barriers
missing links private (Highway) Baden-Württemberg-Worms
Transport Corridors and public BAB A7 (Highway) Federal level Development and upgrade of the A7 0.4
missing links private motorway between Salzgitter and
Göttingen






Seite 5 von 9
   390   391   392   393   394   395   396   397   398   399   400