Page 5 - ePaper
P. 5
1
Private /Public
/ Included in Total invest-ment cost Investment in 2015
Sector Subsector PPP Implementing national – 2017
Project name Description investment Status Barriers/solutions
1 includes agency plan
investment by (Yes/No) (EUR bn) (EUR bn)
state-owned
Transport Corridors public S61 Ostrów Mazowiecka – Ministry construction of 153 km of an expressway corridor as part of No awaiting approval – will be placed on 1.36700 TBD institutional and legal conditions not determined
and ring road of Augustów of Infrastructure the TEN-T core network – Baltic-Adriatic Corridor the priority list (implementation) when preparing and implementing the
missing and Development investment; lack of funding. // Project included in
links ID on the CEF list. The call is competitive and
obtaining funding is not certain.
Transport Corridors public S11 Kępno – Katowice Ministry construction of 165.8 km of an expressway corridor as part of No 1.34215 TBD institutional and legal conditions not determined
and of Infrastructure the TEN-T comprehensive network when preparing and implementing the
missing and Development investment; lack of funding.
links
Transport Corridors public S7 Gdańsk – Warsaw, the Ministry construction of a missing section of the expressway corridor No awaiting approval – will placed on the 1.20000 TBD institutional and legal conditions not determined
and Płońsk – Warsaw section of Infrastructure measuring 238.2 km The section itself measures 57 km. It is reserve when preparing and implementing the
missing and Development a part of the TEN-T core network – Baltic-Adriatic Corridor investment; lack of funding.
links
Transport Corridors public S2/A2 Siedlce – national Ministry construction of 86.7 km of an expressway corridor as part of No 1.16595 TBD institutional and legal conditions not determined
and border of Infrastructure the TEN-T core network when preparing and implementing the
missing and Development investment; lack of funding.
links
Transport Corridors public S10 Płońsk – Toruń Ministry construction of 137.4 km of an expressway corridor as part of No 1.15955 TBD institutional and legal conditions not determined
and of Infrastructure the TEN-T comprehensive network when preparing and implementing the
missing and Development investment; private sector lacking trust and not
links ready to take risks; lack of funding
Transport Corridors public S11 Poznań – Kępno Ministry construction of 109 km of an expressway corridor as part of No 1.05000 TBD institutional and legal conditions not determined
and of Infrastructure the TEN-T comprehensive network when preparing and implementing the
missing and Development investment; lack of funding.
links
Transport Corridors public 1st stage of construction of KZGW and competent Construction of a waterway of international importance (at Yes TDS 1.00000 0.10000 Lack of funding
and the Dunaj-Odra-Łaba RZGW least class 4) from Kędzierzyn-Koźle to Ostrawa, by-passing
missing waterway: the Koźle-Ostrawa meanders of the Odra, which currently cannot be used for
links border-adjacent section transport purposes.
Transport Corridors private Construction of a high-speed PKP Polskie Linie Missing section of the TEN-T core passenger network, Yes Feasibility study and environmental 1.00000 0.02000 Lack of financing
and railway - project Kolejowe S.A. belonging to the TEN-T core network corridor Noth Sea – impact assessment report ready;
missing documentation and land Baltic. timetable agreed.
links purchase
Transport Corridors public private A1 Tuszyn - Pyrzowice, Ministry construction of 81.6 km of a motorway (the north part) as part No awaiting approval – will be on the 1.00000 TBD institutional and legal conditions not determined
and Tuszyn-Częstochowa- of Infrastructure of the TEN-T core network – Baltic-Adriatic Corridor reserve list (the south part) when preparing and implementing the
missing section and Development investment; private sector lacking trust and not
links ready to take risks; lack of funding // Project
included in ID on the Operational Programme
Infrastructure and Environment (OPIE) list.
Included in Annex 5 to the National Roads
Construction Programme (NRCP) for 2007–2013
and in the draft NRCP for 2014–2020
Consequently, the project should be first and
foremost submitted to OPIE.






















Seite 2 von 52
   1   2   3   4   5   6   7   8   9   10