street
Transportation Corridors and Town Capital city of Building a link between No Under 0.2 0.2 difference between valid
missing links bridge the Slovak Petržalka (at Kutlíkova preparation. documentation and
Petržalka – Republic street or Gettingova street) actual situation, land
R7 Bratislava with the planned ownership, appeals by
expressway R7 along the unsuccessful bidders
new town bridge
Transportation Corridors and Relocation Capital city of Relocation of a busy road No Feasibility study 0.18 0.18 difference between valid
missing links of I/502 the Slovak outside the built-up area of documentation and
Republic 5DþD – Welding Institute actual situation, land
Bratislava ownership, appeals by
unsuccessful bidders
Transportation Corridors and Whole Capital city of Completion of tram links – No Under 0.1 0.05 difference between valid
missing links Tomášikov the Slovak 5DþLDQVND 9DMQRUVNi preparation. documentation and
a street Republic and Ružinovská radial actual situation, land
Bratislava tracks – by completing tram ownership, appeals by
tracks through Zátišie – unsuccessful bidders
Pluhová and Tomášikova
6WUHHWV ³5DþLDQVND –
Pluhová (Zátišie) –
Vajnorská – Trnavská”
route; road reconstruction,
building cycling trails,
addressing space for
pedestrians and public
space
Transportation Corridors and Split level Capital city of Sinking an underground No Under 0.450 0.1 Land-planning
missing links transportati the Slovak automobile traffic route at preparation. authorization, building
on road Republic Riverpark – Dostojevského permits, moving utility
solution at Bratislava rad Street. Besides an lines, difference
riverbank – elevated intersection and between valid
internal improved traffic flow and documentation and
town safety, lower noise levels actual situation
circuit and improved public space
is expected.
Transportation Corridors and Road link Capital city of Building a town bridge and No Under 0.2 0.1 Land-planning
missing links Rusovská the Slovak tunnel that will diver preparation. authorization, building
street – Republic transiting traffic through permits, moving utility
Pražská Bratislava SNP Bridge and lines, difference
street Štefánikova Street. between valid
Staromestská Street would documentation and
be covered and become actual situation