for tender.
Transportation City Transportation Modernization of Ministry of Transport, Improving the quality of rail Yes Obtain relevant 0.18 TBD RISK OF COST
tram track - Construction and Regional transportation (removing building permits INCREASE (difference
Karloveská, Development of the Slovak current section speed limits, 2015 between valid
Vajnorská and Republic creating right-of-ways for documentation and actual
5DÿLDQVND UDGLDO trams at intersections, Launch tender for situation, emergency
track reducing noise levels) to main construction condition of structural
increase use of ecological work parts that are about to be
transportation 2015 modernized, increase of
prices of building works
Construction starts and materials)
2015 TECHNICAL DESIGN
RISKS (use of new
Construction ends methods and solutions)
2016 PLANNING RISKS
(correlation with the
maintenance base
modernization project,
missing feasibility study)
LEGAL RISKS (property
rights to lands) –
mitigated by: well
prepared documentation,
sufficient communication
with owners, forcing the
cooperation with the
appropriate bodies,
professionalism of the
contracting authority´s
team.
RISKS OF PUBLIC
PROCUREMENT AND
CONTRACT (appeals by
unsuccessful bidders) –
mitigated by: well
prepared documentation
for tender.
Transportation City Transportation Carrier public Ministry of Transport, Linking the main railway Yes Obtain relevant 0.12 TBD RISK OF COST
transport Construction and Regional station with the city center building permits INCREASE (difference
system (NS Development of the Slovak and railway track to 2016 between valid
MHD) 1 stage Republic Petržalka documentation and actual
st
Main station - Launch tender for situation, emergency


36