This metro line will be executed in order to increase the passengers’
mobility currently travelling on SW-NW direction. This line will inter-
connect two of the most populated and crowded areas of the city,

crossing the downtown. Also, will serve the SW residential
neighbourhoods and the trade nearby Alexandriei ring road, and also
Metro Line 7. MINISTRY OF Rahova and Ferentari neighbourhoods, connecting the downtown and
Transport Urban Transport Public BRAGADIRU- TRANSPORT NS area, Colentina – Voluntari. The execution of this line is proposed to No 3100 3100
be achieved under PPP solution. Route length: around 25 Km / no. of
VOLUNTARI S stations: 30, depot: 1. The execution period: to be agreed after studies
Metrorex
financing.
On 07.06.2012, further identification of certain contradictory aspects in the
applicable legislation for PPP projects, the contract no. 56/2011
“Designing, consulting and technical assistance, legal and financial
assistance services to prepare and carry out the bidding procedure to
award the PPP contract for Metro Line 7 Bragadiru – Voluntari” (Line 7
PPP Project) ceased, until the PPP Law will be modified.
MINISTRY OF
Transport Urban Transport Public Metro Line 2. TRANSPORT Technical characteristics: Length - 1,6 km, No of stations 2. No 2015-2020 168.64 168.64
Extension S
PIPERA
M

Corridors and Purchase of 50 bi-system
Transport missing Privat 5600- 6000 kW electric SNTFM "CFR - MARFĂ" Interoperable locomotives able to run on electrified railway networks in system 15 No 200 140
kV/16,7 Hz (e.g. Austria) or 25 kV/50 Hz (e.g. Hungary).
locomotives (15 kV/16,7
S.A.
links/Business Hz, 25 kV/50 Hz)
enablers fitted with ERTMS equipment

Corridors and Upgrading of 50 electric
Transport missing Privat locomotives of 5100 kW in SNTFM "CFR - MARFĂ" Interoperable locomotives able to run on 25kV/50 Hz system electrified railway networks No 40 28
(e.g.
S.A.
what concerns auxiliary
links/Business services and power circuits Hungary).
enablers

Corridors and Purchase of 50 Diesel SNTFM "CFR - MARFĂ"
Transport missing Privat electric locomotives of S.A. No 170 119
links/Business 2400-3000 hp
enablers

Upgrading 50 Diesel
Corridors and electric locomotives of SNTFM "CFR - MARFĂ"
Transport missing Privat 2100 hp by replacing the S.A. No 78 54.6
Diesel–generator unit and
links/Business the electric traction engine
enablers

Corridors and Purchase of 30 Diesel SNTFM "CFR - MARFĂ"
Transport missing Privat hydraulic locomotives of S.A. No 60 40
links/Business 1250-1500 hp
enablers

Corridors and Upgrading of 30 Diesel
hydraulic 1250 hp
Transport missing Privat locomotives by replacing the SNTFM "CFR - MARFĂ" No 21.6 14.4
S.A.
links/Business Diesel engine and the
enablers hydraulic transmission


Corridors and Purchase of 200 Facnps
Transport missing Privat type wagons for transport SNTFM "CFR No 64 64
- MARFĂ"
links/Business of rocks and stones S.A.
enablers (aggregates)

Corridors and Purchase of 100 Laes
Transport missing Privat type wagons for SNTFM "CFR No 11.4 11.4
- MARFĂ"
links/Business automotive transport S.A.
enablers

Corridors and Upgrading 100 Rmms
Transport missing Privat wagons and conversion SNTFM "CFR No 1.9 1.9
into Shimmns type
- MARFĂ"
links/Business wagons for transport of S.A.
enablers coils

Corridors and
Transport missing Privat Equipment and laboratory SNTFM "CFR No 0.01 0.01
- MARFĂ"
for calibration of tank
links/Business wagons S.A.
enablers


Corridors and Equipment for sanding SNTFM "CFR
Transport missing Privat and painting freight - MARFĂ" No 0.01 0.01
links/Business railcars S.A.
enablers



Page 28