Transport Cooridors and public Increasing the mobility MT / The proposed road bridges facilitate the road mobility of people and Yes Pre-feasibility study has 1500 1500 Barrier no.1: Reduced time for the elaboration of technical –
Sheet1
mission links business environment CNADNR goods between neighbouring countries, connecting the TEN-T Preparation of feasibility economical documents necessary for the implementation of
of the population and
been elaborated
Networks.
the project
between the TEN – T study Solution: Elaboration of terms of reference for the technical –
networks of Romania
economical documents and organizing of specialized
and neighboring states consultancy procurement.
by construction of
connecting road bridges Barrier no.2 Organizing the public procurement for works
Solution: Elaboration of procurement documents and
over natural boundaries implementation of procedure through specialized
(Danube, Tisza and
consultancy
Prut), located as follows: Barrier no.3: Constructors’ poor technical capacity for
Turnu Magurele -
Nicopole, Calarasi - performing the railway works
Solution:
Silistra, Ungheni, Sighet Setting criteria for the selection of constructors able to prove
that they have the necessary resources for performing the
Marmatiei.
works
(Annex 1) Barrier no.4: Reduced administrative capacity of the
Solution: Procurement of consultancy services for experts
beneficiaries
specialized in project implementation

Transport Cooridors and public Improvement of MT/ The Danube is part of the XIIth Pan European Corridor which connects Yes Feasibility study for the 207 207 Barrier no. 1: Long period of time in organizing the
mission links navigation conditions on ACN waterways. Navigation on the Danube is affected by clogging as well project procurement procedure for attributing the works contract
the Black Sea with the North Sea through the Main and Rhine
the Danube by
Solution: Elaboration of the public procurement
increasing the number of as low water depth or frost. The conditions will be improved by documentation and implementation of the procedure by the
use of contracted experts
navigable days on the dredging the waterway as well as by the procurement of icebreaker Barrier no.2: Constructors’ poor technical capacity for
common Romanian –
ships.
Bulgarian sector. (Annex performing the railway works
3)
Solution:
Setting criteria for the selection of constructors able to prove
that they have the necessary resources for performing the
works
Barrier no.3: Reduced administrative capacity of the
beneficiaries
Solution: Procurement of consultancy services for experts
specialized in project implementation.
On-going technical
Resources and Natural resources: Regional project for the S.C. Compania de Extension/rehabilitation of water and wastewater networks, Included in the Master assistance for the Insufficient funds available through Operational Programme to
development of water and
environment efficient and secure Public wastewater infrastructure Utilităţi Publice construction/extension of water and wastewater treatment plants, pumping Plan of the county preparation of the 94.76 - support all the investments/Other financing sources to be envisaged
stations, equipments.
Focşani S.A.
availability
Financing Application and
in Vrancea county Tender Documents.
On-going technical
Natural resources: Regional project for the Extension/rehabilitation of water and wastewater networks, assistance for the
Resources and efficient and secure Public development of water and S.C. Apa Serv Valea construction/extension of water and wastewater treatment plants, pumping Included in the Master preparation of the 58.09 - Insufficient funds available through Operational Programme to
wastewater infrastructurein
support all the investments/Other financing sources to be envisaged
environment
Plan of the county
Jiului S.A.
availability Valea Jiului region (Hunedoara stations, equipments. Financing Application and
Tender Documents.
county)
Regional project for the On-going technical
Resources and Natural resources: Public development of water and S.C. Compania de Apă Extension/rehabilitation of water and wastewater networks, Included in the Master assistance for the 70.7 - Insufficient funds available through Operational Programme to
preparation of the
construction/extension of water and wastewater treatment plants, pumping
efficient and secure
wastewater infrastructure
Arieş S.A.
support all the investments/Other financing sources to be envisaged
environment
Plan of the county
availability in Turda- Câmpia Turzii stations, equipments. Financing Application and
Tender Documents.
region
Regional project for the Technical assistance for the
Resources and Natural resources: Public development of water and S.C Apă Canal Extension/rehabilitation of water and wastewater networks, Included in the Master preparation of the 108.84 - Insufficient funds available through Operational Programme to
construction/extension of water and wastewater treatment plants, pumping
efficient and secure
Financing Application and
environment availability wastewater infrastructure Alexandria S.A stations, equipments. Plan of the county Tender Documents to be support all the investments/Other financing sources to be envisaged
in Teleorman county
started in 2015.
Technical assistance for the
Natural resources: Regional project for the Extension/rehabilitation of water and wastewater networks, preparation of the
Resources and efficient and secure Public development of water and S.C.Apă Canal S.A. construction/extension of water and wastewater treatment plants, pumping Included in the Master Financing Application and 78.77 - Insufficient funds available through Operational Programme to
environment availability wastewater infrastructure Galaţi stations, equipments. Plan of the county Tender Documents to be support all the investments/Other financing sources to be envisaged
in Galati county
started in 2015.
Technical assistance for the
Resources and Natural resources: Regional project for the Extension/rehabilitation of water and wastewater networks, Included in the Master preparation of the Insufficient funds available through Operational Programme to
development of water and
environment efficient and secure Public wastewater infrastructure S.C. Apavital Iaşi S.A. construction/extension of water and wastewater treatment plants, pumping Plan of the county Financing Application and 195.45 - support all the investments/Other financing sources to be envisaged
Tender Documents to be
availability
stations, equipments.
in Iasi county started in 2015.
Technical assistance for the
Natural resources: Regional project for the Extension/rehabilitation of water and wastewater networks, preparation of the
Resources and development of water and S.C. Compania de Apă Included in the Master Insufficient funds available through Operational Programme to
environment efficient and secure Public wastewater infrastructure Oltenia S.A. construction/extension of water and wastewater treatment plants, pumping Plan of the county Financing Application and 254.54 - support all the investments/Other financing sources to be envisaged
availability
stations, equipments.
Tender Documents to be
in Dolj county started in 2015.
Technical assistance for the
Natural resources: Regional project for the S.C. Compania de Apă Extension/rehabilitation of water and wastewater networks, preparation of the
Resources and development of water and Included in the Master Insufficient funds available through Operational Programme to
environment efficient and secure Public wastewater infrastructure Târgovişte - construction/extension of water and wastewater treatment plants, pumping Plan of the county Financing Application and 144.56 - support all the investments/Other financing sources to be envisaged
availability in Dâmbovița county Dâmboviţa S.A. stations, equipments. Tender Documents to be
started in 2015.
Technical assistance for the
Natural resources: Regional project for the Extension/rehabilitation of water and wastewater networks, preparation of the
Resources and efficient and secure Public development of water and S.C. Compania de Apă construction/extension of water and wastewater treatment plants, pumping Included in the Master Financing Application and 133.1 - Insufficient funds available through Operational Programme to
environment availability wastewater infrastructure Olt S.A. stations, equipments. Plan of the county Tender Documents to be support all the investments/Other financing sources to be envisaged
in Olt county started in 2015.