Page 137 - ePaper
P. 137
Country : Portugal
Project list
DISCLAIMER:
• Given the present constraints, the list is not a firm commitment, but represents the best information as of today
• There was an effort to make the list, as comprehensive and information rich as possible, in a short period of time which means that some details may be object of review, later on. It is not a firm commitment
• This is an assortment of projects, not an extensive list,
• A compilation of private investments was integrated on the list as insight to private investment trends. For confidentiality reasons those are given in aggregate terms.
Sector Subsector Private/Public Project name Implementing national Description Included in Status Total invest-ment Investment in Barriers/solutions
/PPP agency national cost (EUR bn) 2015 – 2017
investment (EUR bn)
plan (yes/no)

4. Social xi. Built 3. Public Electric mobility in Ministry of Environment and Replacement of the existing public administration fleet, by Yes Pre-implementation. 0.030 0.030 Funding
Infrastructure environment and the Public Energy electric vehicles.
urban services Administration
4. Social xi. Built 1. Private GNV Private Promoter Increase of the LNG and CNG refuelling stations. Yes Under 0.020 0.020 Funding
Infrastructure environment and implementation
urban services
5. Resources xii. Natural 3. Public Irrigation Projects Direção-Geral de Agricultura e Óbidos; Xévora; Vale da Vilariça; Macieira; Lezíria Grande; Cela; Yes Stand By 0.335 0.173 Public funding;;
and resources: efficient Desenvolvimento Rural Cabanelas; Lis; Benaciate; Baixo Mondego; others long lead time of the projects due to the number
Environment and secure of studies required.
availability

5. Resources xii. Natural 1. Private Lis Swine Private promoters Swine Wastewater treatment Plant needed to reduce Yes Study/preparation 0.020 0.020 uncertainty regarding economic viability
and resources: efficient Wastewater environmental impact of the activity.
Environment and secure treatment Plant Public contribution of 9MEUR through PRODER
availability
5. Resources xii. Natural 2. Public and Implementation of Environment Portuguese Implementation of investments and actions arising from the Yes Assessment 1.900 0.500 Financing the national compensation of projects;
and resources: efficient private River Basin Agency; Municipalities; Private management of Portuguese river basins, which result from the completed Studies on-going to assess contamination
Environment and secure Management Plans Entities; measures identified in the RBMP, framed by the Water
availability (RBMP) Ministry of Environment and Framework Directive (WFD) and the Water Act and
Energy supplemented by specific sectorial plans and programs program.
The RBMP also ensure coordination with other EU policies, such
as the Urban Waste Water (DARU) Policy.
5. Resources xii. Natural 2. Public and Recovery of Environment Portuguese Implementation of projects for the restoration of contaminated Yes Assessment 0.560 0.300 Financing the national compensation of projects;
and resources: efficient private environmental Agency/ sites resulting from industrial activities, geographically defined, completed Studies on-going to assess contamination
Environment and secure liabilities from Ministry of Environment and that contain risks for public health and for the environment,
availability industries Energy requiring urgent resolution, which consist on environmental
liabilities. The priority sites for intervention that were identified
are:
- Complexo Químico de Estarreja
- EX-SIDERURGIA NACIONAL (Seixal)
- QUIMIPARQUE (Barreiro)
- Estaleiro da Margueira
- Fábrica de Explosivos da SPEL
- Areeiro de J. Caetano
- Areeiro de Fernando Branco
Development of studies, projects and remediation works
5. Resources xii. Natural 3. Public Environmental EDM SA/ - Poço da Quinta do Talaminho Yes Assessment 0.053 0.026 Funding
and resources: efficient Remediation in 26 Ministry of Environment and regarding the mentioned mining area, under the Decree-Law completed
Environment and secure Mining Areas - Energy . MAOTE no.192-A/2001, that established the legal regime for granting the
5. Resources xii. Natural 3. Public Amphibious Autoridade Nacional de Acquisition of two amphibious firefighting aircraft intended to No Stand By 0.070 0.070 Access to EU funds is critical.
and resources: efficient firefighting aircraft Proteção Civil (National operate at national level and also in the context of the EU Civil
Environment and secure Authority for Civil Protection) Protection Mechanism
availability/ xiii.
Resilience to
Climate Change
   132   133   134   135   136   137   138   139   140   141   142