29 Transport Missing links SALAMINA Ministry of Concession Yes Competitive 0.35 0.08 1. Project on hold due to the lack of
ISLAND Infrastructures to build and operate a 1.1km road link between Salamina island and dialogue tender financing sources
SUBMARINE , Transport Perama in Attica to replace the inadequate ferry links. The project procedure 2. Local interests linked to the
ROAD LINK and Networks includes 16.4 km of additional road works to improve accessibility underway. ferry connection trying to defer the
and safety of the road network on both sides of the new route Preferred bidder project
2015 3. Technical, Legal and financial
Construction 2016 not yet fully defined as Competitive
Completion 2020 Dialogue not yet concluded

SOLUTIONS:
a. Secure backing for the project in
the framework of the Juncker
package
b. Provide EU Technical
Assistance to leverage existing
resources
c. Accelerate Competitive Dialogue
procedure

30 Transport Missing links ATHENS RING Ministry of Concession to connect the Athens ring road to the Southern Suburbs Yes Feasibility studies 0.35 0.05 1. Lack of public funding to co-
ROAD Infrastructures of Elliniko, Voula, Vouliagmeni etc. in order to bypass the city centre demonstrating the finance the construction of the
SOUTHERN , Transport and divert transit traffic to the ring road. feasibility of the connection by private promoters
EXTENSION and Networks The project involves the construction of a tunnel and upgrading of project completed. 2. Project on hold due to the lack of
existing roads to connect Attica Odos with Vouliagmenis Avenue on Tender for Design funding
a 12 km stretch Competition to 3. Environmental permit not yet
propose best route requested
underway.
Call for tender for
motorway SOLUTIONS:
concession due in a. Secure backing for the project in
2015. the framework of the Juncker
Construction 2017 package
Completion 2022 b. Provide EU Technical
Assistance to leverage existing
resources

31 Transport Missing links CHALKIS Ministry of Construction of 16 km Chalkis bypass to alleviate traffic congestion Yes Feasibility and 0.18 0.15 1. Lack of public funding as there is
RING ROAD Infrastructures and improve the Evia's island interconnection with the national technical studies no room to increase Public
, Transport motorway network which is already built completed. Project Investment Programme
and Networks on hold due to the
lack of EU funding SOLUTIONS:
in the region of a. Secure backing for the project in
Sterea for transport the framework of the Juncker
infrastructure package
projects.
Tender
2015
Construction
2016
Completion 2018