6 Energy Connections Natural gas DEPA The interconnector between Komotini and Stara Zagora is 3 bcm The IGB is 0.22 0.22
Union and production Interconnector expandable up to 5bcm.It is designed to function in reverse mode and included in the
Greece - its projected length is 180 km, of which 150 in Bulgarian territory. It EERP. ICGB AD
Bulgaria – IGB is being developed by ICGB AD (50% BEH EAD, 50% IGI has concluded a
POSEIDON) framework
agreement with
the EBRD for
financing the
project up to
amount of € 130
M. Potential
funding under
CEF
7 Energy Connections Aegean LNG DEPA The Aegean LNG is designed as an offshore terminal (FSRU) with a Potential funding 2014-2016 0.27
Union and production capacity of 3-5 bcm/year, including all the necessary storage under CEF
regasification and berthing facilities for LNG tankers of at least
150.000 cm capacity. The project will impact positively security and
diversification of supply of the entire SEE region



8 Energy Connections Independent GASTRADE New offshore LNG FSRU near Alexandroupolis (mooring position Potential funding 2016-2018 0.34
Union and production Natural Gas 17.6 km) and a system of subsea and onshore pipeline with a length under CEF
System LNG of 29 km (4 km onshore and 25 km offshore), with a daily capacity of
Greece 16.8 MCM/day.

9 Energy Connections Permanent DESFA The project consists in interventions on the already existing Completion 2015 0.0013
Union and production reverse flow at transmission pipelines and above ground installations in BG and EL
Greek – and, in addition, construction of new above ground installations.
Bulgarian
border between
Kula (BG) –
Sidirokastro
(EL)

10 Energy Connections South Kavala DESFA New underground storage facility in depleted gas field, connected via Potential funding 2015-2018 0.4
Union and production storage a 34 km pipeline (of which 32 km offshore) to the National Natural under CEF
Gas System (NNGS) operated by DESFA. The facility is planned to
have the following technical characteristics: Working Gas Volume
360 MCM; Withdraw capacity 4 MCM/day; Injection capacity 5
MCM/day; Cycling rate 2 times/year.
11 Energy Connections INTERCONNECT DEPA A 200 km off-shore pipeline for the transportation of 10 bcm/year and The IGI’s 1
Union and production OR GREECE- constitutes a direct link between Greece and Italy (from the development has
ITALY (IGI) Thesprotian coast of Greece to Otranto). The project is being been supported
promoted by IGI Poseidon S.A a 50-50 Joint Venture between DEPA by the EU’s Trans
S.A. and Edison SpA. European
Network (TEN-E)
as well as through
the European
Energy Plan for
Recovery
(E.E.P.R).
Potential funding
under CEF