TAL oil pipeline and change of existing
Energy Connections and Increase of TAL MERO ČR, a.s. Increase of existing capacity of Study on capacity 0.045 0.025 Implementation approval by partners of
Union production oil pipeline TAL oil pipeline by 6 million increase of TAL oil
capacity. tonnes a year. pipeline prepared by operation permit for TAL oil pipeline.
private ILF Munich.
Energy Connections and Construction of a MERO ČR, a.s. Construction of a new oil pipeline The project is in the 0.25 0.18 Necessary agreement about oil supplies
Union production new oil pipeline with close parallel run with the stage of negotiation between refinery owners in Bavaria and
CTR existing IKL oil pipeline allowing on this option. the oil producer. Long period before issue
Nelahozeves – for supply to part of Bavaria of building and operation permits.
private Vohburg. independently of IKL.
Energy Connections and private Assurance of RWE Gas The project consists mainly of no Ready for immediate 0,032 0.017 Need to implement due to new legislative
obligations regarding safety of operation,
Union production (gas safety of Storage, s.r.o. installation of subsurface safety implementation (until
storage) production wells valves and other equipment to the 2020) for the most risky wells, by 2018. High
of underground production wells of underground financial costs of the project in the light of
gas storages in gas storages in order to increase low gas storage prices (financed solely
the Czech operational reliability and safety of from private sources). Need to implement
Republic gas storages while sustaining normal operation of gas
storages which are needed for security of
gas supply.
Energy Connections and private The project RWE GasNet, This project aims to secure a No Preparation of design 0.0355 0.0179 Negotiation of easements for affected land.
Union production (gas consists of two s.r.o. control system for high-pressure documents
industry) sub-projects: systems at different pressure
Optimization of levels in the given region, to allow
RWE GasNet connecting this high-pressure
high-pressure system to other regional
network, Brno – distribution networks (East
Lanžhot and Bohemia, North Moravia), and to
Optimization of allow increasing production from
RWE GasNet natural gas deposits concentrated
high-pressure in the southeast section of
network, Moravia, where production has
Uherské the potential to increase the
Hradiště – diversification of sources of
Prakšice natural gas supplied to end
customers in South Moravia, East
Bohemia, and North Moravia.
Another objective of the
optimization is to increase the
security of natural gas supply to
more than 620,000 customers in
all segments in this region.
Energy Connections and private The Connection SPP Storage, The Connection of UGS Facility No In preparation. 0.02 0.02 The project contributes to the security of
Union production (gas of UGS Facility s.r.o., Dolní Bojanovice with the nominal Feasibility Studies supply but it faces up to not sufficient
storage) Dolní Bojanovice (Operator of storage capacity 576 million Nm 3 (2012 and 2014) have funds so it is necessary to finance it from
to Transmission Dolní to the Transmission Pipelines of been done. public resources.
Pipelines of Bojanovice NET4GAS and Related
NET4GAS UGS Facility ) Technological Adjustments of the
UGS Facility.