energy market (low prices), like low price of
Project prepared, not 0.6 0.6 Return on investment; current electric
Combined cycle gas turbine (850 implemented due to
Mwe), flexible source of energy, the barriers. CO2 permit.
Energy Connections and public private CCGT Mělník public private source of heat for substantial part No
Union production company of the capital (this part is currently
heated by coal and availability of
this source will decrease rapidly).
intellectual property law. New ways of risk-
Energy Connections and public private PVE Orlík Pumped storage plant in the area No Project prepared, not 0.09 0.09 Accessibility of financial resources and
Union production of existing hydroelectric plant of implemented due to
public private Orlík reservoir, approx. 2x 80 the barriers. sharing should be considered and can
company MWe, flexible source of energy (in represent suitable solution.
order of minutes).
Energy Connections and public private Smart metering Equipment of distribution network No Project prepared, not 0,7-1,4 0,42-0,84 Return on investment (particularly due to
Union production with smart meters (electrometers implemented due to high costs of technology) .
with bidirectional communication, the barriers.
data infrastructure on subordinate
voltage levels, necessary ICT
systems) providing better
public private information to customers,
company potential savings in electric
energy (demand side
management in general),
reduction in electricity thefts etc.
Energy Connections and public private Infrastructure for Charging stations, enhancement No Project 0,055- 0,033- Return on investment, particularly high
Union production electromobility of network in key nodes, ICT implementation is 0,075 0,045 price of technologies (incl. electric
systems supporting the very slow. vehicles) is the main reason for the slow
public private development of mobility, which pace of implementation.
company helps to reach EU goals -
decarbonization, dependence on
the import of primary energy
sources etc.)
Energy Energy Public Use of EPC State Renovation of technical facilities Yes - The detailed analysis 0.04 0.04 Lack of public financing for the renovation
of state buildings is a general barrier in the
Union Efficiency in (Energy organizational of buildings using the method of sectorial of potential of
Buildings Performance units providing energy services with buildings is being Czech Republic and applies here as well.
Contracting) guaranteed result (EPC). prepared. The Regulatory barriers for use of EPC
method for state preparation of the method: state organizational units are not
organizational investment plan will allowed to take loans, the registration of
units be prepared financial commitments according to ESA
subsequently. 2010 is not arranged.
Energy Energy Public New Green Ministry of the Renovation of buildings in order to Yes - The detailed analysis 0.2 0.075 Allocation of funds under the Operational
Union Efficiency in Savings Environment, increase their energy efficiency. sectorial of potential of Programme Environment for energy
Buildings Program - State buildings is under efficient renovation of buildings in the public
program of Environmental way. The preparation sector are insufficient.It is necessary to
public building Fund of investment plan will increase the funds in the new green
(buildings owned be prepared program savings.
by the state) subsequently.