No. Sector Subsector Private/Public/ Project name Implementing Description Included Status Total investment Investment in Intended Barriers/ solutions Planned start Planned
PPP agency in national cost 2015 – 2017 for EU of completion
investment Funds implementatio date (year)
plan (yes / no) n (year)
(yes/no) (EUR mil) (EUR mil)
54 Energy union Connections and public / private LNG Terminal Omišalj LNG Hrvatska Construction of a regasification terminal in Omišalj on the island of Krk. The terminal Yes FS under way 760.0 114.0 No Insufficient funds 2017 2020
production d.o.o. will provide additional source of natural gas for the Croatian market, and also be a
distribution point for natural gas to the surrounding market including Italy, Austria,
Hungary, Romania and Slovenia. For this purpose, a new natural gas pipeline
between Croatia and Hungary was built.
55 Energy Union Connections and Public Project Zagreb on Sava (HE Program na Hydro Electric Power Plant Podsused 46 MW (the first object to be realized, and it is Yes In preparation 1208 140 No Insufficient funds
production Podsused) Savi d.o.o. expected that the completion of the preparation and the start of implementation to be
in 2017).
56 Energy union Connections and public / private Network of stations with LPG and Croatian The realization of the network of stations with LPG and stations for the power supply Yes In preparation 7 3 No Insufficient funds 2016 2018
production stations for the power supply Motorways Ltd. with a view to expand the supply of fuel for motor vehicles
57 Energy Union Connections and Public Interconnection Croatia/Slovenia PLINACRO Along with the existing interconnection Karlovac-Lučko-Zabok-Rogatec, a new gas Yes In preparation 110 50 No Insufficient funds
production (Bosiljevo-Karlovac-Lučko-Zabok- pipeline system Bosiljevo–Karlovac-Lučko-Zabok-Rogatec has been planned which
Rogatec) would significantly increase the capacity of the interconnection of the Croatian and
Slovenian gas transmission systems in this direction. Considering almost all existing
and new supply directions in the surrounding region and the Croatian storage
potentials, this opens significant transit potentials in both directions. The current
capacity is a one-way in direction from Slovenia to Croatia and it is limited: the section
from Bosiljevo to Lučko up to 2.5 bcm/y, and the section from Lučko to Rogatec up to
1.5 bcm/y. Construction of this interconnection is crucial both for the security of supply
of the Croatian market as well as other markets in the SE region.TThe interconnection
Bosiljevo – Karlovac – Lučko – Zabok – Rogatec is possible to connect to the future
IAP project and to the future LNG solution on the island of Krk.
58 Energy Union Connections and Public Compressor stations PLINACRO Construction of such facility is necessary due to opening of the gas market and Yes In preparation 55 30 No Insufficient funds
production providing sufficient transmission capacities and pressure conditions of natural gas
delivery in compliance with the requirements of the users and development of the gas
market in Croatia and the surrounding. It significantly increases efficiency of the gas
transmission system.
59 Energy Union Connections and Public IAP ( SPLIT-ZAGVOZD-PLOČE- PLINACRO The Ionian Adriatic Pipeline (IAP) project has been recognised as a project of Yes In preparation 330 60 No Insufficient funds
production DUBROVNIK-DOBREČ) significant importance. This gas pipeline connection of the new Croatian gas pipeline
transmission system with the TAP project (Trans – Adriatic Pipeline) in Albania
presents a basis of the South-East Europe gas ring and creates a prerequisite for the
gasification of the significant part of the region. As such, it has been included on the
list of the Projects of Common Interest (PCI) and the list of Projects of Energy
Community Interest (PECI). This project would provide diversification of gas supply
from the Caspian and the Near East sources to the neighbouring countries. The
project has been given a new dimension by the decision of the SHAH DENIZ II
consortium on selection of the TAP for the project of transmission of new natural gas
quantities from the Caspian sources of the same name to the European market.
60 Energy Union Connections and Public EL-TO Zagreb - Replacement of the HEP Production In CHP Zagreb is planned to build a new replacement combined-cycle cogeneration Yes In preparation 189.2 18.92 No
production block A with the new CCCGT plant plant driven by a gas turbine engine (CCCGT), to replace old production unit, block A
and heat accumulator (nominal power of 11.5 MW and the total nominal thermal capacity of about 70 MWth).
61 Energy Union Connections and Public Revitalisation of the HE SENJ HEP Production Investment involves the exchange of large machines (generators and transformers), Yes In preparation 38.3 19.3 No Public procurement,
production 110 kV and MV switchgear, replacement of connecting lines and HV cables, relatively quality of
small work on systems USZMR and arrangement of auxiliary facilities. documentation,
insufficient funds
62 Energy Union Connections and Public HE Dubrovnik II. phase HEP d.d. The basic idea of the project phase II HPP Dubrovnik is to have installed flow HPP Yes In preparation 173.3 17.33 No
production Dubrovnik from the current 90 m3 / s increase to 210 m3 / s, to the energy produced
at the plant switched from the initial part of the more valuable, the peak part. In order
to achieve this it is necessary to build new supply tunnel, a water chamber, lock
pressure pipelines, two pressure pipelines, the existing engine installed two production
groups, each installed flow of 60 m3 / s and build new drainage tunnel.
63 Energy Union Connections and Public HE Molve 1 i 2 HEP d.d. HE MOLVE 1 and HPP MOLVE represent a technical solution for multi-purpose Yes In preparation 456 45.6 No
production systems that use the same section of the river hydropower potential, all located on the
Croatian territory. Such a variant with two steps on the same section of the Drava
implied HE MOLVE one of 47 MW and 235 GWh / year, and HE MOLVE 2 of 51 MW
and 248 GWh / year.