Sheet1 Feasibility study.
Connections and Reengineering of the 400 estimated time of The lack of funds may lead to delays in the project implementation.
Energy Union Private Transelectrica Replace low efficiency equipment with modern, highly efficient equipment. Yes commencement – 2016. 25.00 6.00 A mix of European financial assistance in the form of a grant or in
production kV unit in Isaccea
estimated time of financial instruments may be considered.
completion -2020.
The feasibility study
approved by the decison of
the board nr.7/2010, the
project is in the stage of

obtaining the necessary
LEA 400 kV simple circuit permits. The lack of funds may lead to delays in the project implementation.
Energy Union Connections and Private Suceava (RO) – Balti Transelectrica A new line of 400 kV, 139 km long, which helps improving the exchange Yes estimated time of 23.00 4.00 A mix of European financial assistance in the form of a grant or in
production capacity through the eastern interface, with the Moldovan Republic. commencement – 2018 and
(Republic of Moldova) financial instruments may be considered.
estimated time of
completion -2022. There
are high pressures to start
this project sooner than
announced in the RET
development plan.

In order to improve the interchange capacity through the western and South- Feasibility study endorsed
Shift Portile de Fier – Eastern Romanian interface, the netwrok in the area is considered for
Resita – Timisoara – reinforcement: LEA 400 kV Portile de Fier – Resita and the expansion of the by the decision of the board The main problem relates to the purchase and the ownership of the
Sacalaz – Arad axis to 400 station 220/110 kV Reşiţa by building a new unit of 400 kV+shift to 400 kV of nr.2/2012, the project is in land on the electric line corridor and to obtaining the
Connections and kV oltage – Stage I: LEA LEA 220 kV d.c. Reşiţa –Timişoara – Săcălaz – Arad, including building the the stage of obtaining the licenses/permits.
Energy Union Private Transelectrica Yes necessary permits. 47.00 46.00
production 400 kV Portile de Fier – units of 400 kV Timişoara and Săcălaz. This project improves the interchange estimated time of The lack of funds may lead to delays in the project implementation.
Resita + 400 kV station capacity at the RO-HU-RS border; intensifies the N-S Corridor from N-E commencement – 2014. A mix of European financial assistance in the form of a grant or in
inResita + expansion of Europe to S-E Europe via Romania and in conjunction with other European estimated time of financial instruments may be considered.
existing units. projects it could help creating the 400 kV electricity transport corridor from completion -2017.
Romania to Italy (via the submarine cable ME-IT).
The project is in its final

stage. The feasibility study
was revised, and it will be
approved by the end of this
year by SNN Board, and
by the end of January by
the General Shareholder The first project of this kind in Europe. Insufficient staff with
Energy Union Connections and Private Heavy water clastic Nuclearelectrica The purpose of the installation is to remove the tritium form the moderating No Meeting. Licensing in 166.00 36.00 expertize for such a porject; to go around this obstacles, a number
production installation National Company agent and the cooling agent and to store it in special containers. process, documentation of actions are underway to appoint an Owners' Engineer (of the
ready to obtain a comfort beneficiary) formed of experts in this field.
letter from CNCAN. The
procurement documents for
the selection of an IPC
contractor will be prepared
by mid-2015.


Post Fukushima
modifications of Unit 5 Set-up a new seismically qualified location on-site for hosting the On-site The procurement
existing buildings to documentation for an IPC
accommodate the facilities Emergency Control Center&Fire Fighters Facility as well as to to shelter the contract has been
Connections and required for severe accidents Nuclearelectrica most important intervention equipment including: mobile diesel generators, completed. SNN Board will Complete the approval procedure and have the contract signed
Energy Union Private mobile diesel engine driven pumps, firefighter’s engines, radiological No 30.00 30.00 within the foreseen deadline (any postponment caused by delays in
production management and National Company approve the IPC contract by
interventions as set up in emergency cars, heavy equipment to unblock roads. This facility will be set up the end of 2014. The the procurement process will directly impact the foreseen time).
„Romania – National Action in unit 5 - for which a decision has been taken that it will be used for such contract will be signed by
Plan post Fukushima”. purposes and not as a nuclear unit anymore. March 31, 2015.

Others /Operational
programme under
the

'Investment for
growth and jobs'
goal/ Smart,
sustainable and
inclusive Classification and
growth and the evaluation of mineral National Agency for Update of existing mineral resources contracts information system “Mining
Energy Union Public Cadastre and Titles Registry” with development of classification and evaluation No Planning 0.8 0.8 Lack of funds/
achievement of resources/ reserves of solid Mineral Resources
economic, social and minerals of mineral resources/ reserves of solid minerals
territorial cohesion/
Enhancing
institutional
capacity and an
efficient public
administration
(E-governance)

Development of a permanent register containing all closed storage sites and Lack of funds/
Other /Clean surrounding storage complexes, including maps and sections of their spatial Lack of information, especially for the data needs analysis, due to
Energy and Energy Permanent Register for National Agency for extent and available information relevant to assess whether carbon dioxide is The specifi-cations are incipient promoted legislation and new developed CCS technology
Energy Union Efficiency/ Public Carbon Capture and Mineral Resources stored definitively and permanently retained. The system has to be No finalized and ready for a 0.9 0.9 in Romania/ Solutions - a close cooperation with similar Norway
Investment in Storage Sites in Romania call of proposal
institutional capacity complemented by a geological and geographical monitoring module of the agency, with expertise in CCS/ An experienced project management
parameters of CO2 associated risk storage team in NAMR