Page 169 - ePaper
P. 169
Sheet1
IICCMRE aims to transform a former place of isolation into one of
The "Prison of silence" The Institute for reflection about the criminal nature of Communism. The "Prison of
Memorial in Râmnicu the Investigation silence" Memorial in Râmnicu Sărat consist of the restoration of the
Social Built enviroment of Communism prison and its opening to the public, setting up exhibition spaces inside
Sărat and the
Infrastructur and urban Public Educational Center on Crimes and the prison to commemorate the personalities imprisoned here. No Planning 6 6 Obtaining the funds
e services Memory of the The Educational Center on Communism in Romania is a permanent
communism in exhibition space inside the former prison in Râmnicu Sărat
Romania Romanian Exile

Built enviroment
Social and urban Business Department for The main barrier is financing. Solution is finding
Infrastructur services/Education Public Incubator SMIs, Business Establishing and development of incubators centers Yes 50 50 sources of financing.
enviroment and
e and training Program tourism

The technical design

required to obtain the
construction permits is
Extension of the oncology under preparation and it
Social units with radiotherapy Oncology units of the hospital will be extended with a new radiotherapy will be followed by the
Infrastructur Health Public wards from the Ministry of Health ward buitl betwee two wings of the buildings partially underground . Yes launching the 34 34 Lipsa finantare
Emergency Universitary
procurement for the
The technic- economic indicators approved.
e
Hospital Bucharest works execution. The
works are expected to
start în 2015 and
completed within 24
months subject to getting


Technic – economic
Demolishing of the indicators are under
existing zoo base and in approval. The works are
Social its place build of a
Infrastructur Health Public hematology building - Ministry of Health The building of the Hematology Ward on the same site of Yes expected to start în 7 7
Zoobase
2015 and to be
e Oncology Institute (Prof. completed whithin 36
Dr.Ion Chiricuta-Cluj months, subject to
Napoca)
getting financing.
The hospital will provide medical care for the Cluj county, as well as the

Social Health Public Emergency Ministry of Health neighbour counties, and will host the activity of the current Emergency Yes These are included in 200 200
Infrastructur regional County Hospital ( multi block buildings ). the Partnership
e hospital Cluj Agreement 2014 –
The hospital will provide medical care in Iasi county, as well as for the 2020 under Regional

Social Emergency neighbour counties, and will host the activity of the current Emergency Operational
Infrastructur Health Public regional Ministry of Health County Hospital ( multi block buildings ). Yes Programme 2014 – 200 200
2020,
e hospital Iasi Tematic Objective 9-
The hospital will provide medical care for Dolj county, as well as the Promote the social
neighbour counties, and will host the activity of the current Emergency inclusion and proverty
County Hospital (the current building needs consolidation)
Social Emergency mitigation, Axis 8 –
Infrastructur Health Public regional hospital Ministry of Health Yes Health and social 200 200
e Craiova Infrastructure, financing
for the entire axis
amounting to EUR 400
Establishment of the Regional Oncology Institute to provide specific medical care in the western
region of the country Technic – economic
indicators are under
approval. The works are
Social Health Regional
Infrastructur Public Oncology Ministry of Health Yes expected to start în 115 115
2015 and to be
e Institute completed whithin 36
Timisoara
months, subject to
getting financing.


Replace the low power generation technology with a high co-generation
technology, with a high power, taking into account the market conditions.
Connections Refurbishment and The process involves building a new power unit with installed capacity The feasibility study Need for market research, because of the low predictibility
Energy Union Private modernization of Iernut SNGN Romgaz SA Yes 300.00 200.00
and power plant, Mures of 400 MWe, equipping two generators with a capacity of 200 MWe, was developed. in the electricity sector.
production County with the possibility for co-generation and resilient operation through an
easy adjustment to the market needs.

Improve the capacity of the storage unit from 150 mil. cm/cycle to 600 mil.
Increase the storage cubic meters/cycle to secure the supply to household consumers,
Connections capacity of the pit gas especially during peak consumption times. The works needed to reach The feasibility study Link to the investment policy of SNTGN TRANSGAZ SA in
Energy Union Private SNGN Romgaz SA No 140.00 140.00
and underground storage unit this target are: build a compression station, interlinking with high was developed. the area
production in Ghercesti, Dolj pressure SNTs, gas treatment installations, a gas measurement unit and
County a SCADA system to transfer data and orders.




Page 14
   164   165   166   167   168   169   170   171   172   173   174