Page 163 - ePaper
P. 163
Sheet1

Foundation of tha Național The building no longer ensures operational safety on A1 and A2 sections, as was
ascertained by the competent institutions according to Laws 10/1995 and 50/1991. In
Social Center of Excellence ,
Infrastructur Education and training Public Differentiated and MEN this case, sections A1 and A2 must be urgently reinforced. In accordance with the No Intention 50 50 Lack of funding
feasibility study, provisions also include the extension of the building hosting sections B1
e Specialized Training - and B2 so that all the academic activities may be performed.
Valcea

Revitalization of 12 land-based high schools, from different development regions, from
different landforms and from areas with different agricultural particularities. Such
Social Land-based education, revitalization would involve, in addition to creating modern learning conditions (mending The risk of investing in educational units which might have difficulties reaching
Infrastructur Education and training Public providing a chance to many MEN and refitting study areas, hostels, cafeteria, as the case may be), especially the No Intention 50 50 the number of student places – solution: financial support during study
years, and after graduation, so that students choosing these high schools
e young people purchase of specialization-specific agricultural equipment and machinery, both for may find employment
carrying out training stages, as well as for one’s own production.


Increasing the educational and the research results dissemination capacities by erecting
Social Education and training Public Didactic and conference Medicine and a building with didactic areas and conference rooms. Such an investment could soon F.S. 4.34 4.34 Lack of funding
become the center of meetings and debates with educational and medical purposes,
Infrastructur spaces within the premises Pharmacy University thus contributing to a better visibility of the Romanian education and research in the No
e of Tg.Mures world and the development of international collaborations to a truly competitive level .



The increase of life quality for the persons involved in the educational process,
respectively, regular students, Ph.D. students, resident physicians and researches by
reducing the accommodation space deficit and improving dwelling conditions. The
construction of a university hostel in this area would have the following advantages:
- placement of the accommodation areas within the University campus premises
Social Accommodation spaces Medicine and where the didactic and research activity takes place.
Infrastructur Education and training Public within the premises of MPU Pharmacy University - the existence in the area of an institution micro-cafeteria. No F.S. 3.9 3.9 Lack of funding
- the existence of sports fields
e Tg.Mures of Tg.Mures - the assurance of all necessary conditions for carrying out educational activities.
- the existence abroad of the conditions required by educational activities
- the existence of all the necessary conditions for educational activities.
- the existence of the County Emergency Clinical Hospital in the vicinity
.

Potential risks include financial and technical risks:
financial risks consist in the financing being delayed or
suspended, which would require finding other sources of

Central University funds, including own sources, to prevent the interruption in
Library,Biblioteca Due to the existing narrow premises, and to the fact that the activitiy is 2015-2016 elaboration execution. Technical risks,
Social Education and Ministry of such as design errors or delays in obtaining authorizations
split into several locations, the desire is to have a new building which
Centrala Universitara ,
Infrastructur trainingU/niversitie Public 23, Marinescu St., 4-6 National would provide the necessary environment to access, use and preserve Yes of SF and PT Building of 5.5 3.5 or permits, which could be managed by selecting
objective may start in
e s Education consulting teams with expertize in this field which can
Pasteur St. the pool of books. 2017
check the documents and select suppliers/implementators
with a technical and financial potential so that the
services/works may be at the required standards. A close
cooperation of the management team with the
representatives of IB, the ministries in charge of providing

Potential risks include financial and technical risks:

financial risks consist in the financing being delayed or
suspended, which would require finding other sources of
funds, including own sources, to prevent the interruption in
Improve the education infrastructure by creating new education halls is a 2015-2016 elaboration execution. Technical risks,
Social Education and Amfitheatre Building, 8 Ministry of must. such as design errors or delays in obtaining authorizations
Infrastructur training/Universitie Public V. Babes St. (Cluj) National Given that the number of UMF students is growing, the existing Yes of SF and PT Building of 12 3 or permits, which could be managed by selecting
objective may start in
e s Education halls are insufficient. 2017 consulting teams with expertize in this field which can
check the documents and select suppliers/implementators
with a technical and financial potential so that the
services/works may be at the required standards. A close
cooperation of the management team with the
representatives of IB, the ministries in charge of providing
Training Centre for The project has been Project to be transferred from under the authority of SNN to
Social Education Public Ministry of Regional
Children and Young
Infrastructur and /Private People in the town of Development and The completion stage of the training centre started in 2010 frozen due to the lack of 10.00 6.00 the Ministry of Development, as the project is not specific to
the SNN line of business
Public
funds from the state
e training
Cerna oda Administration b dget
The Center aims to develop breeding programs, protection and
conservation of genetic resources for both the crop species and the rare
species, threatened and endangered. Carried out specialized labs for

National Center for investigations and specific facilities to ensure reproduction and growth
Social Built environment Improving the protection controlled progenies maintaining genetic purity. Insufficient funds / Acceptance to finance an objective of
Designing modernization of existing capacities within the unit for
and conservation of
Infrastructur and urban Public genetic resources of RSFD Nucet fish reproduction and selection in order to achieve agreement with No Proposal 1.5 1 national and European interest that contribute to increasing
the competitiveness of the fisheries sector.
e services
freshwater aquaculture. the built in project activities and EU requirements.
Realization of the project will ensure necessary biological material
popular fish aquaculture development and maintaining biodiversity in
natural and artificial ecosystems.

Ministry of Agriculture Construction of a hall with 4 compartments used as CA storage cells, Provide the material
Social Built enviroment Mass engraftment needed to establish the Insufficient funds/
and Rural
other storage and sorting rooms.
Infrastructur and urban Public complex for dDevelopment Se urmărește obținerea pomilor de nuc altoit, deficitar pe piata No nucifers plantations, with 0.78 0.78 Sale market and high demand for seeding material
e services nucifers europeană. new homologated
species
Page 11
   158   159   160   161   162   163   164   165   166   167   168