Page 158 - ePaper
P. 158
Sheet1


Educational building with a height regime SB(semi-basement)+GF+6S,
the built area shall be 1100 sm, the developed built area will be
around 8800 sm

• the semi-basement houses the power plant, halls for multiplication,
printing works and UTC-N archive issues

Social Education PUBLIC Multipurpose building in Technical University • the ground floor houses the library and the reading hall, the technical No design 2.95 lack of funding from own sources/ request of community funds
Infrastructur and training Cluj Napoca, 2 of Cluj-Napoca books library and the academic records archive 2.95 and a close supervision and coordination of their use
• the 1st floor has two amphitheatres with 200 seats each,
Observator str.
e
bathrooms, two staircases, the elevator shaft
• the 2nd floor has 2 conference halls with 200 seats each,
bathrooms, two staircases, the elevator shaft
• the 3rd and the 4th floors host the offices of Ph.D students,
research laboratories
• the 5th and the 6th floors host seminar halls and didactic laboratories



Building with a height regime GF+1S and the following characteristics:
CONFERENCE AND • the ground floor houses a 120-seat conference room, lounge, staircase, bathroom
Social Education and training PUBLIC EXHIBITION MINIHALL in Technical University of • the 1st floor hosts an exhibition area, bathrooms, the staircase No design 0.55 0.55 lack of funding from own sources/ request of community funds and a
Infrastructur Cluj Napoca, 28-30 Cluj- Napoca The built areas shall be 200 sm, the developed built area shall be around 400 sm, and close supervision and coordination of their use
e Rene Descartes str. the Building shall comply with the norms by employing facilities for people with
disabilities.


The future monoblock wing shall have a height regime of 2B+GF+2S. One of the main
goals is ensuring the space necessary to refit the library as per the regulations in force:
reading halls, book warehouse, rare book warehouse, a hall where maps and
Social Education and training Public The Faculty of BabeșBolyai University periodicals may be referred to. Yes drawn 2.5580 2.558
Infrastructur Geography building of Cluj-Napoca Theoretical courses are reserved the theatre, 8 course classes, a multimedia hall, test
e paper halls, seminars, offices for the academia. The building system has insulated
reinforced concrete foundations under the pillars, reinforced concrete strip foundation,
reinforced concrete frames + diaphragms, partition walls made of ACC or similar
materials (Ytong), terrace roof. The developed area of the new building is set to 3585.6
sm.

The new extension building of the Faculty of European Studies shall have
a height regime of 2B+GF+3S. the two basements shall host
warehouses/technical room, the lower one also operating as a civil
protection shelter. The ground floor houses the coffee shop with the

related extensions. Each of the 3 floors shall have one classroom,
bathrooms and hallways. The extension building of the Theatre Faculty
shall have a height regime of B+GF+1S+R2F(receding 2nd floor). The
Social Education The Faculty of BabeșBolyai basement shall host the space required to preserve and display the
Infrastructur and training Public European Studies University of Cluj- stronghold wall. Next to it there shall be a warehouse, a civil protection Yes drawn 3.552 3.552
shelter, related spaces and performance halls, a carpenter’s and a
Napoca
and the Theatre and
e
Television Faculty mechanic’s workshop, the technical room and a secondary staircase.
The ground floor shall host the performance hall, whose height shall
cover two floors. At the 1st floor – the technical cabin reserved for the
performance hall, which is reached via a catwalk that perimetrally
surrounds the lounge. In the opposite corner – a classroom. At the 2nd
receding floor there shall be a coffee shop cu extensions. One shall
place in the receded area a photo studio and a video studio. The recess
at the 2nd floor shall house offices and bathrooms The total developed


The necessity that MPU Craiova enter among medical higher
education institutions whose learning is focused on the
The project aims at achieving a material base designed to implement a students and the practical these have acquired. Students will
new study concept dedicated to the students and residents’ acquiring have access to a perfectly simulated hospital outpatient, both
The simulation and Medicine and the practical clinical skills necessary to ensure a smooth transition in terms of layout, as well as the inclusion of intensive care
Social Education towards the European healthcare labour market. The healthcare
Infrastructur and training Public clinical skills centre of Pharmacy University services system shall benefit from human resources with solid practical No Project 6 6 and emergency medicine and, following the activities to be
MPU Craiova
of Craiova
carried out, they shall increase their practical training level, in
e training since as early as their studentship, the wish here being to lower accordance with the European standards. Additionally,
the risk of occurring medical errors during the graduates’ first years of residents and young academia shall benefit from the new
employment with various European healthcare systems (considering the infrastructure, thus a bridge being created between the
elevated mobility rate of young physicians).
theoretical and the practical training.
University of
Elaboration of FS and
Social Education Modernisation of C2 Agricultural The risks which might occur during project implementation
Infrastructur and training Public Hostel - UASVM Sciences and The restoration of operational capacities as a result of the new sanitary Yes TP in 2015, the works 2 1 can be both financial and technical in nature
norms
may commence in
e Iași Veterinary 2016
University of
Social Education Modernisation of A4 Agricultural Elaboration of FS and The risks which might occur during project implementation
Infrastructur and training Public Hostel - UASVM Sciences and The restoration of operational capacities as a result of the new sanitary Yes TP in 2015-2016, the 2 1 can be both financial and technical in nature
norms
works may commence
e Iași Veterinary in 2017
Modernisation and University of
Elaboration of FS and
Social Education Public overhaul of veterinarian Agricultural The necessity of creating a new flow and a new functionality imposed TP in 2015, the works The risks which might occur during project implementation
Infrastructur and training clinics (p2, p3, p4, p5, Sciences and by the necessity of accrediting the Faculty of Veterinary Medicine Yes may commence in 5 2 can be both financial and technical in nature
e p6, p7) Veterinary 2016


Page 9
   153   154   155   156   157   158   159   160   161   162   163