Total
Private Included in investmen Investment 2015-
/ national ts cost 2017
Sector Sub-sector Public/ Project Name Implementing Description investment plan Status (EUR (EUR million) Barriers/solutions

TOP PRIORITIES
Energy Union Connections Public The development of the Transgaz The project shall connect Podi yes ongoing feasibility study 560 168 validation of the Funding Request by the EC
and NTS on the Romanian to the Gas Metering Station – Horia (Arad county).According to
production territory along the route TRANSGAZ’ envisaged development plan, the project shall ensure the
Bulgaria – Romania – possibility for permanent physical bi-directional flows through the
Hungary – Austria interconnections with Bulgaria and Hungary as well as the completion
of the Giurgiu – Nădlac corridor aiming to materialize the supply of
Caspian gas to Romania and Europe. The project envisages the
achievement of the following:- Podişor-Corbu pipeline, 81 km;- Băcia-
Haţeg-Jupa-Recaş pipeline, 167 km; three compressor stations (CS
Corbu, CS Haţeg I and CS Horia I) with a total installed power of Pinst
= 33 MW, and amplification up to 49.5 MW- Corbu–Hurezani–Hateg
pipeline, 250 km;- Recaş–Horia pipeline, 47 km;After the project
commissioning, a maximum gas transmission capacity of 1.5 m
bcm/year towards Bulgaria and of 4.4 bcm/year towards Hungary
will be possible.



Energy Union Connections Public The NTS development Transgaz The project implies the construction of a new gas transmission pipeline yes ongoing feasibility study 254 38 validation of the Funding Request by the EC , this project is
and project for taking over in the area of the town Tuzla ( Constanta county) up to the technological related to the actual exploitation of the off-shore Black Sea
production Black Sea gas by node Podişor (Giurgiu county) to connect the offshore gas to be gas
means of the extension available at the Black Sea shore and the Bulgaria – Romania –
of the Southern Corridor Hungary – Austria corridorThe Tuzla – Podişor pipeline of
in the East –West approximately 247 km shall be designed for 55 bar maximum
direction. pressure and 48” diameter (Dn 1200) and 40” (Dn 1000)..


Project for the Transgaz pre-feasibility study nomination as PCI under the second PCI list this
development of the project is related to the actual exploitation of the off-shore
Central corridor in the Black Sea gas
East-West direction for

taking over Black Sea
gas The achievement of the project entails the following :
- the use of the existing transit pipelines T1/T2;
- the use of the existing NTS pipelines of approximately 210 km;
- the upgrading of the existing NTS pipelines of approximately 400 km;
Energy Union Connections Public - the replacement of the existing NTS pipelines or the construction of yes 550 0
and new pipelines up to a total length of approximately 430 km.
production
The gas pipeline system shall be equipped with 4 new compressor
stations with a total installed power of approx. 66 MW:
- CS Oneşti, located in Bacău county;
- CS Coroi, located in Mureş county;
- CS Ha țeg II, located in Hunedoar
- CS Horia II, located in Arad county.
the project for the Transgaz The project implementation is based on the following rationale and A feasible technical the compliance with the relevant applicable EU Regulations
development of NTS involves works such as:- The building of a connection between the solution for this project is , coordination with the validity terms of the relevant contracts
dedicated pipelines currently transiting Russian gas across Romania presently under analysis.
interconnection with towards the Balkan corridor and the National Gas Transmission
Connections the dedicated System; This project is part of the first list of European projects of
Energy Union Public pipelines part of the yes 0.7 0.7
and international gas common interest. A feasible technical solution for this project is
production transmission corridor presently under analysis.

Energy Union Connections Public National Transmission Transgaz The project consists of the development of the following yes ongoing feasibility study 110 55 validation of the Funding Request by the Romanian funding
and System development in objectives: entities
production North East Romania for New compressor station at Oneşti
enhancing gas supply to - New compressor station at Gherăieşti
the region and ensuring - New transmission pipeline, Dn 700, Oneşti – Gherăieşti, 103 km
gas transmission long
capacity to Moldavia
- New transmission pipeline, Dn 700, Gherăie
km
Reverse flow at the Transgaz The works aim at creating the technical conditions enabling gas A feasible technical this project depends upon the implementation of the above-
Medieşu Aurit Gas filtration and commercial metering in both flow directions.The solution for this project is mentioned projects
Metering Station project will enable bidirectional flows between the Romanian and presently under analysis
Connections
Energy Union Public (Satu Mare County) Ukrainian gas transmission systems. yes 0.7 0
and
production



Page 1