level traffic nodes in
the main intersections.
39. Transport Corridors E67/A4 Latvian State Roads Project foresees:Yes Timing 116 0 Barriers:
and missing Baltezers – (Private partner) existing two-lane road included 2018 – million Insufficient funding
links Saulkalne reconstruction on the in 2019 EUR due to high
(Road) dual carriageway with TDG202 Completed investment cost and
four lanes including feasibility impact on state
0
construction of two- studies, deficit.
level traffic nodes in environme
the main intersections. ntal impact Solutions:
assessment Possibly PPP is
, project envisaged.
incorporate A project
d in the management unit
spatial plan will supervise the
and have project’s planning
design and implementation
project. under the close
supervision of the
promoter and the
relevant Ministries.
40. Transport Corridors E67/A1 Riga Latvian State Roads Baltezera bypassYes Completed 1,5 million 1,5 million Barriers:
and missing – Lilaste construction and A1 included feasibility EUR EUR Insufficient funding
links (Road) rebuilding from 2 to 4 in studies, (sketch for total project
lanes TDG202 design) cost.
(two environme
carriageways) in 0 ntal impact 157
section Adazi – Lilaste assessment million Solutions:
, project EUR Possibly CEF
incorporate (works) (sketch design); not
d in the defined (works).
spatial A project
plan. 2016 management unit
– 2018 will supervise the
(sketch project’s planning
design) and implementation
2021 – under the close
2027 supervision of the
(works) promoter and the
relevant Ministries.
41. Transport Corridors The Freeport of Ventspils The purchase of the Yes Timing 19,9 19,9 Barriers:
and missing purchase of Authority ship for the depth included 2015-2017 million million Insufficient funding
links the ship for maintenance in in EUR EUR considering the
the depth Freeport of Ventspils TDG202 project total cost.
maintenance 0
in Freeport Solutions: