economy e Stage 2 4MW electricity funding.
installation, second
floor construction Solutions:
works. EIB loan.
Air conditioning
systems-chillers &crac
units. Electrical ATS
panels, UPS systems.
RACK systems with
PDU 400 es.
peac
Raised floor systems.
Secutiry systems for
access and cctv. Fire
detection and
estingushing systems.
Environment
monitoring systems.
Energy Union
15. Energy Union Connections 330kV High Latvijas elektriskie tīkli The project is being Yes, Project 127,42 64,89 Barriers:
and Voltage AS (that is transmission implemented underplanned start million million Capital intensive
production Network system managementBEMIP and is include expected in EUR EUR investment with
interconnecti subsidiary of 100%in the ENTSO-E 2015. The lack of sufficient
on Latvian state ownedTYNDP 2012 project projects returns leads to
„Kurzemes company “Latvenergo” Nr.4.4.1. as part of will be shortages of long
bydBalt
loks” AS, supervised Nor connection completed term finance.
3.stage: Ministry of Economics) between Sweden and in 2019. A combination of
330kV line currently implements the Lithuania, being both EC grants 58.71
„Ventspils – project, but TSO (AS of highest national and mio eur in total
Tume – Augstsprieguma tīkls) international strategic (17.613 mio eur for
Imanta” will take impo overrtance, as it 2015-2017) and
implementation rolefacilitates energy “Latvijas elektriskie
(except financing)market development in tīkli” AS own funds
starting from 2015 the Baltics. is envisaged.
Starting from 2015
TSO will supervise
the project’s
planning and
implementation
under the close
supervision of the
relevant Ministries.
16. Energy Union Connections Modernizati AS "Latvijas Gāze" Implementation of this Yes Timing 190 72,45 Barriers:
and on and project is significant to 2014–2020 million million Insufficient funding
production expansion of ensure compatibility EUR EUR
Inčukalns with the EU energy