Included in Total Investment in
national
No. Sector Sub-sector Project name Implementing agency Description investment plan Status cost (EUR bn) 2015 – 2017 Barriers/solutions
investment
(EUR bn)
HR TSO: Plinacro Ltd. Project is part of the cross-broder North - South Gas Corridor, submitted by the Members of V4. T echnical delivery of No (yes/no) feasibility study in progress According to the Croatian side, financial barriers put obstacle in front of the realization of a
Connections and Croatian- Hungarian the pipeline carried out in 2011 on the Városföld – Slobodnica line with a 2,6 BCM/year capacity. Bidirectional flow is compressor station at Donji Miholjac which would assure the bidirectional firm capacity,
10. Energy Union assured only from Hungary to Croatia. A compression station is required on both sides of the interconnection point at 0.02 and lack of sufficient amount of gas sources makes the project unfeasible.
production reverse flow Dravaszerdahely – Donji Miholjac in order to realize the bidirectional firm capacity from Croatia to Hungary.
EURATOM ALLEGRO is the Gas cooled Fast Reactor (GFR) demonstrator as identified in the roadmap for the development of the A Memorandum of Understanding was signed on 20 May, 2010 between
Gas Fast Reactor technology. ALLEGRO is the Gas cooled Fast Reactor (GFR) demonstrator as identified in the ÚJV Řež, a.s. (Czech Republic), MTA-EK Budapest (Hungary) and VUJE,
roadmap for the development of the Gas Fast Reactor technology. In 2010, three research institutes from the Czech a.s. (Slovakia). The National Centre of Nuclear Research (NCBJ) Warsaw
associated member.
11. Energy Union Connections and Allegro fourth generation Republic, Hungary and Slovakia, stepped into the ALLEGRO development, with the aim of creating an ALLEGRO (Poland) signed the Memorandum of Understanding in 2012 as n.a n.a
Consortium and hosting the demonstrator in one of these countries The CEA contributes to the preliminary phase of
production nuclear reactor the project. Consecutively the formation of the international Consortium is underway. The Consortium members
agree to use their own financial resources in combination with the expected governmental support in their countries
and international support from the EU Framework. The Consortium assumes the establishment of a GFR Research
Centre of Excellence.
Hungarian electricity 2x400 kV tie line between Sajóivánka (HU) and Rimavská Sobota (SK) to increase the cross–border capacity on the yes Feasibility study in progress No obstacles known presently.Following a feasibility study and based on the study a
Hungary – Slovakia transmission system HU – SK profile and to support market integration. Governmental approval will be needed to implement the project.
12. Energy Union Connections and interconnection between operator MAVIR ZRt. jointly 0.02
production Sajóivánka (HU) and
Rimavská Sobota (SK) with the Slovak TSO, SEPS
a.s.
Connections and 400/120 kV transformer Hungarian electricity Second 400/120 kV transformer and 2x70 Mvar shunt reactors in station Sajóivánka to accommodate new system yes pre-feasibility/feasibility No obstacles known presently.Following a feasibility study and based on the study a
13. Energy Union transmission system needs arising from the establishment of the Sajóivánka - Rimavská Sobota interconnector 0.01 Governmental approval will be needed to implement the project.
production in Sajóivánka operator MAVIR ZRt.
Natural Gas Transmission The corridor includes the following projects: Városföld-Ercsi– Győr 210 km long power transmission + extension of No Still under planning. Financial barriers may occur. Implementation of the project will depend on the Black Sea
Closed Company (FGSZ Városföld compressor station’s performance by 5.7 MW + odour modification along the 6 km long Ercsi- gas exploitation as well.
Ltd.) Százhalombatta line and the extension of the compressor station’s performance by 52MW. Extension of compressor
14. Energy Union Connections and Romanian-Hungarian- station at Csanádpalota or Algyő by 5.6Mw and building the transmission between Győr, Mosonmagyaróvár and 0.4
Austrian Gas Corridor
production
HU/AT boarder in the length of 188 km. Capacity: 4.55-31.2 million m3/day.
(MVM)
offshore.
Connections and Agri project (Azerbaidjan- Hungarian Electricity Ltd. The Constanta (RO) - Arad Csanádpalota (EN) line development and expansion with sections both onshore and No Feasibility Study The content of the feasibility study is not known, currently no obstacles seen.
15. Energy Union production Georgia - Romania
interconnector)
Hungarian electricity New interconnection (new 2x400 kV tie-line) between SK and HU starting from Gabčíkovo substation (SK) to the yes Feasibility study in progress No obstacles known presently. Following a feasibility study and based on the study a
operator MAVIR ZRt. jointly profile
Gönyű (HU) and
16. Energy Union Connections and Interconnection between transmission system Gönyű substation on Hungarian side (preliminary decision) to increase the cross–border capacity on the HU – SK 0.03 Governmental approval will be needed to implement the project.
production
Gabčíkovo (SK) with the Slovak TSO, SEPS
a.s.
Governmental approval will be needed to implement the project.
from the establishment of the Gönyű - Gabčíkovo interconnector
transmission system
17. Energy Union Connections and 400/120 kV transformer Hungarian electricity Third 400/120 kV transformer and 70 Mvar shunt reactor in station Győr to accommodate new system needs arising yes pre-feasibility/feasibility 0.01 No obstacles known presently.Following a feasibility study and based on the study a
production in Győr operator MAVIR ZRt.
Ministry of Human In order to ensure that the future doctors gain sufficient experience, and have a possibility to gain practical No Investment decision taken has been prepared Lack of long term finance. A project management unit will supervise the project’s planning
Capacities experience, the current Szt. Janos Hospital will be transformed into a training clinic. The goal is to ensure a long term and implementation under the close supervision of the promoter and the relevant
18. Social Infrastructure Education and training Semmelweis University’s clinical background for the medical education within SOTE (the leading medical university in Hungary, with a huge 0.3 0.3 Ministries.
international student community), thus resulting that the university will become self-sustaining. Moreover the
Clinical Background
development would ensure health care service for the entire western Budapest agglomeration area.
Development of the The project aims to develop and renew the institions and tools required for the dual training, which is considered a Due to constraints in order to meet the fiscal deficit target, the funds devoted to trainings
priority for Hungarian economy. The development of the business and school workshops, prerequisite asset
19. Social Infrastructure Education and training tools and the framework Ministry for National investments and ICT system upgrades, as well as the renovation/expansion of buildings are emphasized. The goal of No The investment decisions can be made according to the targets 0.24 0.24 have been reduced. On the oth
of the dual vocational
Economy
approved by the EDIOP.
the promotion of employment, SME support and the development of dual vocational
educationy system. the investments is to improve the efficiency and modernity of dual training in both SME, enterprise and school training is of high importance.
arenas.
National Innovation Office As part of the energy and climate targets of the Europe 2020 strategy, in 2010 Hungary agreed to raise the proportion Yes The overall healthcare sector asset valuation with a special focus on the Lack of long term finance + coordination and legal problems, leading
and Ministry of Human of renewable energy sources to 14.65 per cent, energy reconstruction of the hospitals is completed the planning is in A combination EU of MFB and, EIB financing as well as private capital is envisaged.
Resources · to achieve a 18 per cent overall energy saving and process
Energy and public work · increase its greenhouse gas emissions in sectors outside the EU Emission Trading Scheme by no more than 10
reconstruction with per cent (compared with the 2005 level) by 2020. Also the Comission Directive 2012/27/EU requires the energy
20. Social Infrastructure Health innovative technologies efficiency reconstruction of 3% of the public buildings 0.3 0.1
of the Hungarian · increase its greenhouse gas emissions in sectors outside the EU Emission Trading Scheme by no more than 10
hospitals per cent (compared with the 2005 level) by 2020. Also the Comission Directive 2012/27/EU requires the energy
efficiency reconstruction of 3% of the public buildings
In accordance with this obligation the survey of the hospitals has been completed and the planning of the
reconstruction is in process.
Providing the Ministry of Human A project which would lead to an educational system where all levels of education are back and forth permeable. The No Investment decision taken has been prepared Lack of long term finance.A project management unit will supervise the project’s planning
conditionality’s of dual Capacities aim of the project is to define and develop the curriculum of the vocational (company based) part of the education at and implementation under the close supervision of the promoter and the relevant
21. education and the every level so not only the theoretical elements are built on and connected properly to each other. 0.15 0.15 Ministries.
synchronisation of dual
higher and vocational
Social Infrastructure Education and training education
Providing the Ministry for National A project which would lead to an educational system where all levels of education are back and forth permeable. The No Investment decision taken has been prepared Lack of long term finance.A project management unit will supervise the project’s planning
conditionality’s of dual Economy (vocational aim of the project is to define and develop the curriculum of the vocational (company based) part of the education at and implementation under the close supervision of the promoter and the relevant
education and the
22. synchronisation of dual training) every level so not only the theoretical elements are built on and connected properly to each other. 0.15 0.15 Ministries.
higher and vocational
education
Resilience to Climate Rainwater harvesting in Ministry of Interior & The urban runoff systems cannot drain flesh floods and the usage of collected and stored rainwater should be No - lack of public and private financing, affordability of high construction cost A combination
23. Resources and Change (Built urban areas to reduce Ministry of National improved from water management point of view. The support of public should be solved to catch rain at their area 1.00 0.1 of EC grants, EIB and MS finance. A project management unit can supervise the project’s
Environment environment and Development before it reaches collection system. planning and implementation under the close supervision of the promoter and the
urban services) flood risk relevant Ministries.
Pannonia Ethanol Ltd.. Installing an equipment to capturing CO2 emission of the plant for further industrial use. Hence, the CO2 emission No Engineering team is secured. The potential technology providers and Lack of available EU funds to cover the capital expenditure. The project (in full s
Natural Resources: would be eliminated and the GHG balance of the plant would be exceptional in the EU. contractors have been identified. Own resources are available. viable only if the extra CO2 will be used in an innovative and economically efficient way.
24. Resources and efficient and secure CO2 capture by 0.02 0.01 E.g. through a new investment in Hungary
Dunaföldvár
Environment
availability
Pannonia Ethanol Ltd.. Construction of a cellulosic ethanol plant in Dunaföldvár or Mohács that would process 300.000 tons of ILUC-free raw No Eligible land and the lead engineering team is secured. Existing Lack of available EU funds to cover the CAPEX.
Natural Resources: material harvested from marginal fields. The project would create 1.000 jobs in the construction sector. agreement with the potential technology providers. Pannonia's
Resources and Cellulosic plant in
25. Environment efficient and secure Dunaföldvár or Mohács shareholder is the world's leading constructor of advanced biofuel 0.2 0.15
plants. Main contractors have been identified and approached. Own
availability
sources are available.
Natural Resources: n.a Waste disposal based on household waste and biomass. No Contribution to increase renewable energy rate and to cut residential energy costs.
26. Resources and efficient and secure Plasma waste porcessing 0.1 0.05
Environment
project (with prylosysis)
availability
2/4