Sector Subsector Private/Public/ Project Implementing Description Included in Status Total Investment Barriers/solutions
PPP name agency national invest- in 2015 –
investment ment cost 2017
plan
(yes/no) (EUR bn) (EUR bn)

Energy Union Connections public Construction Electricity Construction of a No Feasibility 0.0 0.0 lacking fiscal space
and of a new 400 System Operator new AC 400 kV studies - a
production kV single-circuit route on
interconnect interconnector Bulgarian
or Maritsa (OHL) with a territory has
East Bulgaria length of 130 km been
- Nea Santa, and a capacity of selected.
Greece 2000 MVA Project
between Maritsa finance
East 1 (BG) and preparatory
Nea Santa (EL) activities
(onshore). have been
initiated.

Energy Union Connections public Construction Electricity Construction of a No The project is 0.0 0.0 lacking fiscal space
and of 400kV System Operator new 400 kV AC in the phase
production power line line (OHL) of 13 of pre-
between the km and with a feasibility
Maritza East capacity of 1700 and
1 and MVA between feasibility
Maritza East Maritsa East 1 and studies.
3 Maritsa East 3 Contract for
(onshore). route
selection has
been signed,
a preliminary
development
plan - parcel
plan and pre-
allocation of
posts have
been
approved.
EIA has
been
prepared.