Page 13 - ePaper
P. 13
Sector Subsector Private/Pu Project name Implementing Description Included in Status Total Investment Barriers/solutions
blic/PPP agency national invest- in 2015 –
investment ment cost 2017
plan
(yes/no) (EUR bn) (EUR bn)

Transport Corridors and public Rhine-Danube ÖBB-Infrastruktur Railway Projects along the TEN-T Rhine-Danube Core Network Corridor yes studies and 1.9 0.8 EU grants
missing links Core Network AG works
Corridor -
Railway

Transport Corridors and public Scandinavian- ÖBB-Infrastruktur Railway Projects along the TEN-T Scandinavian-Mediteranian Core Network Corridor yes studies and 4.7 1.0 EU grants
missing links Mediterranian AG, BBT SE works
Core Network
Corridor -
Railway
Transport Corridors and public Baltic-Adriatic ÖBB-Infrastruktur Railway Projects along the TEN-T Baltic-Adriatic Core Network Corridor yes studies and 7.3 2.3 EU grants
missing links Core Network AG works
Corridor -
Railway

Transport Corridors and public Terminals - ÖBB-Infrastruktur Investments in Rail/Road Terminal Infrastructure yes studies and 0.3 0.2 EU grants
missing links Railway AG works

Transport Corridors and public Karawankentunn ASFINAG Construction of 2nd tube for A11 Karawankentunnel (AT-SLO) yes studies 0.2 0.1 EU grants;
missing links el - Road A11 realisation with EIB
depends on loan interest
rates (reduction of
financial costs for AT)





















Seite 6 von 6
   8   9   10   11   12   13   14   15   16   17   18