plant itself.

Main project lines:

- 3D seismic
- Magnetotellurics
- Power plant building







Energy Union Interconnections Oil pipeline TRANSPETROL, Connecting oil pipeline No Stage of project 0.1 – 0.2 0.1 – 0.2 Need for legislative
and production Bratislava - a.s. systems East - West, preparation depending on modifications,
Schwechat diversification of routes (realization of the selected incorporating the
for transport of oil, studies and project route (city route into AP (area
increased energy works on routing) corridor 0.1 bn. plan), property-rights
security of Austria and settlement
Slovakia in the event of Carpathian
oil crisis corridor 0.2 bn
EUR)




Energy Union Interconnections Reconstruction TRANSPETROL, Diversification of No Project at stage of 0.02 0.02 No barriers are known
and production and increased a.s. transport route of oil to realization at the moment
transport capacity Slovakia, increased restricting project
of oil pipeline energy security of realization
Friendship 1 (Adria) Slovakia




Energy Union Interconnections Revitalization TRANSPETROL, Alternative transport of No Project feasibility 0.04 0.04 Settling property
and production and renewal of a.s. various types of oil by rights, e.g. agreeing
SWS Vojany rail study preparation to project
complex implementation by
shareholders




Energy Union Interconnectio Boiler House U. S. Steel Košice, Upgrade of the boilers NA Building Permit, EIA 0,14 0,14 High capital
n and Upgrade (B6 & s.r.o. aimed at fuel expenditures; changing
Production B7) conservation and regulations: - own
supply stability resources; following
more stringent limits
than the required

13