Technical assistance for
Natural Regional project for the Extension/rehabilitation of water and wastewater networks, the preparation of the
Resources resources: Public development of water Compania de construction/extension of water and wastewater treatment plants, Included in the Financing Application and 74.76 - Insufficient funds available through Operational Programme to
and efficient and and wastewater Apă Oradea pumping stations, equipments. Master Plan of the Tender Documents to be support all the investments/Other financing sources to be
environment infrastructure in Bihor county envisaged
secure county started in 2015.
availability

Technical assistance for
Natural Regional project for the Extension/rehabilitation of water and wastewater networks, the preparation of the
Resources resources: Public development of water S.C. AQUAVAS S.A. construction/extension of water and wastewater treatment plants, Included in the Financing Application and 161.45 - Insufficient funds available through Operational Programme to
and efficient and and wastewater pumping stations, equipments. Master Plan of the Tender Documents to be support all the investments/Other financing sources to be
environment infrastructure in Vaslui county envisaged
secure county started in 2015.
availability
Completion of Glina
wastewater treatment
Natural Completion of Glina wastewater treatment plant, rehabilitation of Supporting documents
Resources resources: Public plant, rehabilitation of Bucharest City Hall main sewerage collectors and of Dambovita water main (Caseta) Included in the of the Financing 158.5
and efficient and main sewerage in Bucharest municipality Master Plan of the Application under
environment collectors and of county
secure Dambovita water main revision
availability (Caseta) in Bucharest
PRIORITIES



In order to facilitate the preparation of students from the provinces,
NSPAS has created territorial centers which carry out their activity in

areas more or less compliant with the activity of a higher and research-
based education, which it does not own and burden the university’s
funds. In Constanţa municipality, the university holds a land area, under
Education, research, ownership, where one could build a premises with the above functions.
conference and Considering the dynamics of this center, by increasing the number of
accommodation Ministry of National programs and the number of students, as well as the fact that there is The regularity of funding assurances; Changes subsequently
Social Education Education/ National occurred in the systematic planning of the area influencing the
Infrastructur and training Public spaces; International School of Political available land, there are grounds to erect a building which would host Yes A feasibility study exists 8.45 8.45 investment site and requiring modifications in its layout;
those spaces required to carry out specific higher education and research
Conference Center in
e and Administrative Legislative changes on investment funding and execution.
Constanţa, FN3 Studies activities. This building would benefit from a triple purpose, serving the
Bucovinei str., plot 1, Constanţa Territorial Center, but also operating as a NSPAS regional
Constanța county research and conference center. The Research and Conference Center
shall be used during the entire year for research activities involving
academia, Ph.D. students, MA students and regular students. In addition
to these, it shall organize activities such as: science communication
sessions, national and international conferences, themed summer/winter
schools. The building shall host accommodation and cafeteria areas.




The building no longer ensures operational safety on A1 and A2
Consolidation and Ministry of National sections, as was ascertained by the competent institutions according to
Social Education extension of education Education/ National Laws 10/1995 and 50/1991. In this case, sections A1 and A2 must be A pre-feasibility The regularity of funding assurances; Legislative changes
on investment funding and execution, as well as the
Infrastructur and training Public and research premises School of Political urgently reinforced. In accordance with the feasibility study, provisions No study exists 6.8330 6.8330 achievement of investments in the vicinity of monuments.
in Bucharest, 6
e and Administrative also include the extension of the building hosting sections B1 and B2 so
Povernei Str., district 1
Studies that all the academic activities may be performed.



Sports Hall Building and The educational process also includes attending sports classes. The
Swimming Pool, Ministry of National university does not possess a sports base for either carrying out the There is a case study
Social Education Education/ National sports-related didactic process or having the students practice leisure The regularity of funding assurances; Legislative
Infrastructur and training Public University campus, School of Political sports. The campus comprises the land required to erect a sports and a No and the approval of 0.362 0.362 changes on investment funding and execution.
NSPAS management
Pantelimon town, no 25
e and Administrative professional swimming pool to host the learning process and the
Biruinței Blvd., Ilfov Studies harmonious development of the youth attending the NSPAS academic
County
courses..


building wing with a height regime 2B(basement levels)+GF(ground
floor)+2S(storeys)+RF(receding floor), intended for Education and
Social Education PUBLIC EXTENSION– Technical University administration spaces. Spaces shall be created for seminar halls, No design 0.922 lack of funding from own sources/ request of community funds
Infrastructur and training MODERNI SATION OF of Cluj-Napoca laboratories, classrooms, offices for the academia, administrative 0.922 and a close supervision and coordination of their use
TUCN build,
e spaces, business and public food service spaces, whereas the two
15 C Daicoviciu str.
basements shall outfitted for the archive. The built area shall be 220 sm
and the developed built area shall be 1485 sm