Page 108 - ePaper
P. 108
Project examples:
Railway transport:
Construction of high-speed railway lines Warsaw – Łódź – Poznań/Wrocław
(€7.5 bn);
Construction of the Podłęże – Szczyrzyc –Tymbark/Mszana Dolna railway line and
modernisation of the existing railway line no. 104 Chabówka – Nowy Sącz as part of
the project Construction of the Podłęże – Szczyrzyc – Tymbark/Mszana Dolna
railway line and modernisation of a section of the Nowy Sącz – Muszyna – national
border and Chabówka – Nowy Sącz railway line. The project will improve the
Poland’s railway connection with Slovakia. The new line Podłęże – Szczyrzyc –
Tymbark is a part of the TEN-T comprehensive network; (€1.4 bn);
Road transport:
Motorway: A1 Tuszyn – Pyrzowice, Tuszyn-Częstochowa section as a part of the
TEN-T core network – Baltic-Adriatic Corridor (€1 bn);
Construction of expressway missing links located on TEN-T base corridor - Baltic-
Adriatic Corridor:
- S7 the Płońsk-Warszawa section (€1.2 bn);
- S1 Pyrzowice - Bielsko-Biała : section Kosztowy - Bielsko-Biała (€900 mn);
- S69 Bielsko-Biała, national border: section of Węgierska Górka bypass (€400
mn).
Construction of expressway corridors: S19 Białystok-Lublin (€2.4 bn), S19 Rzeszów
– national border (€2.2 bn) as a part of the TEN-T network.
Border infrastructure
Comprehensive programme of border infrastructure modernisation (including rail
border crossing points) and required transport corridors, to increase accessibility
and efficiency of functioning of the external border of the European Union (€4 bn).
2
Railway transport:
Construction of high-speed railway lines Warsaw – Łódź – Poznań/Wrocław
(€7.5 bn);
Construction of the Podłęże – Szczyrzyc –Tymbark/Mszana Dolna railway line and
modernisation of the existing railway line no. 104 Chabówka – Nowy Sącz as part of
the project Construction of the Podłęże – Szczyrzyc – Tymbark/Mszana Dolna
railway line and modernisation of a section of the Nowy Sącz – Muszyna – national
border and Chabówka – Nowy Sącz railway line. The project will improve the
Poland’s railway connection with Slovakia. The new line Podłęże – Szczyrzyc –
Tymbark is a part of the TEN-T comprehensive network; (€1.4 bn);
Road transport:
Motorway: A1 Tuszyn – Pyrzowice, Tuszyn-Częstochowa section as a part of the
TEN-T core network – Baltic-Adriatic Corridor (€1 bn);
Construction of expressway missing links located on TEN-T base corridor - Baltic-
Adriatic Corridor:
- S7 the Płońsk-Warszawa section (€1.2 bn);
- S1 Pyrzowice - Bielsko-Biała : section Kosztowy - Bielsko-Biała (€900 mn);
- S69 Bielsko-Biała, national border: section of Węgierska Górka bypass (€400
mn).
Construction of expressway corridors: S19 Białystok-Lublin (€2.4 bn), S19 Rzeszów
– national border (€2.2 bn) as a part of the TEN-T network.
Border infrastructure
Comprehensive programme of border infrastructure modernisation (including rail
border crossing points) and required transport corridors, to increase accessibility
and efficiency of functioning of the external border of the European Union (€4 bn).
2