Sector Sub-sector Project name Implementi Description Included in Status Total Investment Barriers/solutions
ng agency national investme in 2015 –
investment nt cost 2017
plan (yes/no) (EUR (EUR bn.)
bn.)
interconnections are
built. The extended
Kruonis PSPP will
contribute significantly
to the flexibility and
reliability of the whole
Baltic transmission
system.

Energy Electricity 330 kV ETL Ministry of Double circuit 330 kV Yes Investment decision 0.02 0.02 Barrier: lack of EU financing.
Alytus-Kruonis Energy ETL, ensuring 500 MW taken,
transfer capacity via environmental
Lithuanian-Polish OHL impact assessment
interconnection project completed, design
LitPol Link. works on the way.
Energy Electricity Smart Metering Ministry of The Third Energy No Preparation process 0.252- Investment The economic analysis of the scenarios in
Mass Roll-out Energy Package requires for Smart Metering 0.38 needed in CBA (published in 2012 ) has also
Member States to ensure pilot project is (dependi 2017 will demonstrated that none of the scenarios is
implementation of ongoing. Pilot will ng on the be economically viable, so it should be
intelligent metering be conducted evaluatio evaluated concluded that the smart metering roll-out
systems for the long- during 2015-2016. ns after after the in Lithuania is not beneficial under any
term benefit of The results of pilot the pilot Pilot scenario.
consumers. This project will be used and the project at Final decision regarding Smart metering
implementation may be to check the scenario the end of mass roll-out will not be made until the
conditional on a positive assumptions of chosen) 2016 results of pilot project is clear and
economic assessment of Smart Metering approved.
the long-term costs and CBA (2012 m.).
benefits (cost-benefit
analysis – CBA). For Decisions of mass-
electricity, there is a rollout possibilities
target of rolling out at will be made after
least 80% by 2020, of the final results of
the positively assessed the pilot.
cases.
CBA for large-scale roll-
out in Lithuania by 2020
was negative, but the
   625   626   627   628   629   630   631   632   633   634   635