Page 591 - ePaper
P. 591
promoter and the
relevant Ministry.
28. Transport Corridors Electrificatio SJSC Latvian Railways Electrification of the Yes Timing 549,2 46 million Barriers:
and missing n of the East-West rail corridor included 2014-2022 million EUR Insufficient
links East-West and the passenger train in The review EUR funding,
rail corridor route network NDP202 of the considering the
of
0 an
and the Pieriga with 25 kV d feasibility total investment
passenger alternating current TDG202 study cost.
train route 0 along with
network of the Solutions:
Pieriga with calculation There's a possibility
25 kV s of the to attract ESI funds
alternating traction and CEF. Taking
current power into account the
supply of long period of
the project
examined implementation
technical necessary evaluate
options has other sources of
been financing.
completed. A project
Ongoing management unit
the will supervise the
technical project’s planning
preliminar and implementation
y design of under the close
the supervision of the
preferred promoter and the
solution; relevant Ministry.
environme
ntal impact
assessment
;
Preparatio
n of an
Investment
plan.
29. Transport Corridors Renewal of SJSC Latvian Railways Rolling stock renewal Timing 567 0 Barriers:
and missing railway for freight operators in 2019-2030 million The main project
links rolling stock accordance with the EUR risks are compared
for freight requirements of the to the investment
operators new infrastructure size. This means
that even
financially viable
project cannot be