Page 580 - ePaper
P. 580
Undergroun infrastructure. (1.stage
d Gas 72.45
Storage. million
EUR)
17. Energy Union Connections Construction BW Maritime Latvian gas supplyYes Timing 120 120 Barriers:
and of LNG system is not connected 2017 million million Insufficient funding
production terminal with the EU's total EUR EUR
natural gas supply
system and as a result
has developed an
isolated energy
markets.
“Singleeed to increase Yes
18. Energy Union Energy Increase of JSC The n Timing 2,1 billion 400 Barriers:
efficiency in energy Development Institution” energy efficiency in (NDP 2014–2020 EUR million Feasible if
buildings efficiency final consumers 2014- EUR additional funding
is
for final bigger than opportunity 2020) for grants is
consumers to support these provided
projects from ESI
funds. In planning
period 2007-2013 only
2.3% of all Latvian
multi-apartment
residential buildings
where renovated from
ESI funds. While the
actual number of
buildings can be
increased up to 36,6
thousand buildings if
sufficient funding
provided. The industry
is second sector with a
big potential to
increase energy
efficiency, reduce
energy consumption
and to improve the use
of resources. Therefore
manufacturing
enterprises will be
eligible to receive
funding.
19. Energy Union Connections Improvemen Sadales tikls Investments in the No Implement 11 million 11 million Barriers:
and t of security reconstruction and ation isEUR EUR Low density of
production of supply optimization of existing divided in customers in rural
   575   576   577   578   579   580   581   582   583   584   585