Energy Connection private Substation_110_Czarnków ENEA Operator Main substation modernization No 2015-2016 (initiation)* 0.00126 0.00126 There are many risks affecting planning and
Union s and ZPP investment process in distribution networks.
production Risks affect deadlines and costs of projects.
The most important problems are complicated
procedures and legislative – particularly
obtaining formal approvals and permissions
which are necessary in the process of energy
infrastructure modernization and construction.
Existing laws and lack of permission to use the
property for construction purposes extend the
duration of energy infrastructure projects.
Moreover the cost of permission to use the
property for construction purposes is often much
bigger than market price. Investments are
blocked and cancelled in extreme cases. Another
problem is lack of Law of transmission corridors.
Power line investments must fulfill the
environmental criteria. Proving that the
investment is not harmful to the environment
takes time and requires special studies and
permissions.
Energy Connection private Czeczott Power Plant Kompania Węglowa 1.KW S.A. plans to build a coal-fired, supercritical power plant No Analytical and design phase TBD TBD
Union s and Construction Plan S.A. (together with a business partner) with a capacity of up to
production 1,000 MW
2. The investment is to ensure KW S.A. the demand for coal
with a calorific value of about 19 MJ/kg. Location of the plant
is associated with a very convenient transportation of coal
from mines Piast and Ziemowit thus minimizing its cost of
delivery.
Energy Connection private The project to build a mine in Kompania Węglowa 1. Achieving the stability of production in subsequent years. No Analytical and design phase TBD TBD
Union s and the Lublin Coal Basin S.A. 2. Magnification of the resource base.
production 3. Acquisition of cheaper coal, improving the company's
competitiveness on the markets.
Energy Connection private Construction of the fluidized Jastrzębska Spółka One of the goals of the project is the use of coal slurry and No The project is in the initial phase of TBD TBD
Union s and bed boiler in the coal mine Węglowa S.A. eliminating its negative environmental effect by avoiding future operation.
production Zofiówka. market sale of this type of by-products of coal production that
are affecting the low emissions.
Energy Connection private Construction of power plants Jastrzębska Spółka The economic use of waste to generate energy. No Currently the project is in the phase of TBD TBD Procurement procedures, all problems
Union s and based on use of alternative Węglowa S.A. conceptual analysis and preparation of recognized for investment projects -ensuring
production fuels (garbage, waste coal documentation. financial engineering, long lasting administrative
etc.). procedures (obtaining building permits, public
consultation, social and NGO resistance), need
to update strategic documents
Energy Connection private Construction of tar Jastrzębska Spółka 1. The final product will include soot used in the tire industry. No Currently the project is in the phase of TBD TBD
Union s and processing plant. Węglowa S.A. 2. Tar is an intermediate product yield by the group JSW conceptual analysis and preparation of
production coking plants. documentation.

Energy Connection private Energy use of methane from Jastrzębska Spółka Increasing the efficient use of methane from coal. No Analytical and design phase TBD TBD
Union s and old mines Węglowa S.A.
production
Energy Connection private Construction of the power Katowicki Holding Management of coal dust in an efficient manner. No Analytical and design phase. TBD TBD
Union s and plant (fluidized bed boiler) fed Węglowy S.A.
production by a low calorific value coal
dust (as coal dust that is
difficult to be placed on the
market).
Energy Connection private The use of methane as an Katowicki Holding The use of methane from coal (Coal bed methane) No Analytical and design phase. TBD TBD
Union s and energy carrier through the Węglowy S.A.
production construction of a ground
drainage.