Page 3 - ePaper
P. 3
Country : POLAND

Project list*
* The following project list illustrates only investment potential and is not binding for implementation.
1
Private /Public
/ Included in Total invest-ment cost Investment in 2015
Sector Subsector PPP Implementing national – 2017
Project name Description investment Status Barriers/solutions
1 includes agency plan
investment by (Yes/No) (EUR bn) (EUR bn)
state-owned
Transport Corridors private Construction of high-speed PKP Polskie Linie Construction of high-speed railway lines Warsaw – Łódź – Yes Feasibility study on the construction of 7.50000 0.75000 Lack of financing
and railway lines Warsaw – Łódź Kolejowe S.A. Poznań/Wrocław a high-speed railway line Warsaw –
missing – Poznań/Wrocław Łódź – Poznań/Wrocław ready.
links
Transport Corridors public Upgrading of the Odra KZGW (National Upgrading OW to meet parameters of a class 4 waterway at Yes TDS (Transport Development Strategy) 5.00000 0.30000 Lack of funding
and Waterway (OW) at least to Water Management least, thus becoming part of the TEN-T (Trans-European
missing navigation class 4. Authority) and Transport Network).
links competent RZGW
(Regional Water
Management
Authority).
Transport Corridors public Border Modernisation Ministry of Interior Comprehensive programme of border infrastructure No In conceptual phase. 4.03500 0.50000 Lack of financing dissallowing to comprehensivly
and Programme modernisation (including rail border crossing points) and develop border infrastructure and transnational
missing required transport corridors, to increase accessability and transport corridors connecting border crossing
links efficiency of functioning of the external border of the European points on external European Union border;
Union. Necessity to allow implementation of selected
investments also on teritory of third countries
(RU,BY,UA)
Transport Corridors public S19 Białystok – Lublin Ministry construction of 238.6 km of an expressway corridor as part of No one section close to Lublin - awaiting 2.40123 TBD institutional and legal conditions not determined
and of Infrastructure the TEN-T comprehensive network approval - will be on the reserve list when preparing and implementing the
missing and Development investment; lack of funding.
links
Transport Corridors public S19 Rzeszów – national Ministry construction of 85.4 km of an expressway corridor as part of No one section in the Rzeszów 2.22010 TBD institutional and legal conditions not determined
and border of Infrastructure the TEN-T comprehensive network agglomeration - awaiting approval - will when preparing and implementing the
missing and Development be on the reserve list investment; lack of funding.
links
Transport Corridors public S6 Słupsk - Gdańsk Ministry construction of 133.7 km of an expressway corridor as part of No awaiting approval – will be placed on 2.18348 TBD institutional and legal conditions not determined
and of Infrastructure the TEN-T comprehensive/core network the priority list (implementation) when preparing and implementing the
missing and Development investment; lack of funding.
links
Transport Corridors public Construction of the Silesian KZGW and competent Construction of an East-West connection between the Yes TDS 2.00000 0.10000 Lack of funding
and Canal. RZGW canalised Upper Vistula waterway and the Odra Waterway
missing
links
Transport Corridors public S74 Kielce – Nisko Ministry construction of 127.3 km of an expressway corridor as part of No 1.53678 TBD institutional and legal conditions not determined
and of Infrastructure the TEN-T comprehensive network when preparing and implementing the
missing and Development investment; lack of funding.
links
Transport Corridors public S17 Lublin – Hrebenne Ministry construction of 113.3 km of an expressway corridor as part of No 1.43013 TBD institutional and legal conditions not determined
and of Infrastructure the TEN-T comprehensive network when preparing and implementing the
missing and Development investment; lack of funding.
links
Transport Corridors private Construction of the Podłęże – PKP Polskie Linie The project will improve the Poland’s railway connection with Yes Feasibility study and environmental 1.41867 0.01200 Lack of financing
and Szczyrzyc –Tymbark/Mszana Kolejowe S.A. (Polish Slovakia. The new line Podłęże – Szczyrzyc – Tymbark is part impact assessment report in progress.
missing Dolna railway line and State Railways Joint of the TEN-T comprehensive network.
links modernisation of the existing Stock Company)
railway line no. 104
Chabówka – Nowy Sącz as
part of the project
Construction of the Podłęże –
Szczyrzyc – Tymbark/Mszana
Dolna railway line and
modernisation of a section of
the Nowy Sącz – Muszyna –
national border and
Chabówka – Nowy Sącz
railway line






Seite 1 von 52
   1   2   3   4   5   6   7   8