Transportation Corridors and Node Bratislava, Ministry of Transport, Upgrading the railway Yes Documentation for 0.26 0.10 A feasibility study for
missing links linking Airport of Construction and Regional building permit. complete Bratislava node
M.R. Štefánik to Development of the Slovak should be prepared. The
ŽSR (Railways Republic Construction starts feasibility study estimate:
of the Slovak 2017 December 2016.
Republic)
railway network

Public passenger Transportation

Transportation City Transportation Carrier public Ministry of Transport, Replacing carrier bus line Yes Obtain relevant 0.21 TBD RISK OF COST
transport Construction and Regional 95 (interval 5 - 10 min) in building permits INCREASE (change of
st
system 1 stage Development of the Slovak urban Bratislava part - 2015 concept, increase of price
Main station - Republic Petržalka (population of building works and
Janíkov dvor, 106,000) with tram transport Launch tender for materials)
operational main construction TECHNICAL DESIGN
section work RISKS (use of new
Bosákova street 2015 methods and solutions)
- Janíkov dvor, PLANNING RISKS
2 part Construction starts (correlation with the
nd
Bosákova street 2016 project carrier public
- Janíkov dvor transport system (NS
st
st
Construction ends MHD) – 1 stage, 1 part)
2017 LEGAL RISKS (an issue
of ownership relations in
case of a change of
concept or solution ) -
mitigated by: well
prepared documentation,
sufficient communication
with owners, forcing the
cooperation with the
appropriate bodies,
professionalism of the
contracting authority´s
team.
RISKS OF PUBLIC
PROCUREMENT AND
CONTRACT (appeals by
unsuccessful bidders) –
mitigated by: well
prepared documentation