Transportation Corridors and ' 6YUÿLQRYHF - Ministry of Transport, This section with the two Yes Obtain relevant 0.17 TBD TECHNICAL DESIGN
missing links Skalité, half- Construction and Regional VKRUWHU 6YUþLQRYHF DQG building permits RISKS ( Borne by the
profile (2 nd Development of the Slovak 3RĐDQD WXQQHOV VKRXOG 01/2011 contractor (Yellow FIDIC))
stage) Republic create a direct link from RISKS OF PUBLIC
Žilina towards Poland for Launch tender for PROCUREMENT AND
heavy freight transportation main construction CONTRACT (None). A
as well. Only freight work contract with the
vehicles up to 7.5 t can use 06/2012 contractor was signed on
the current road I/12 due to 28 June 2013, the 1 st
unsuitable width, layout and Construction starts stage of the “D3
structural engineering 01/2015 6YUþLQRYHF - Skalité, half
condition, and Route I/12 section” project
passes in particular through Construction ends implementation started on
WKH YLOODJHV RI 6YUþLQovec, 10/2016 25 October 2013 after
ýLHUQH DQG Skalité. There is submission of the site)
one black spot on Route
I/11 and the accident rate is
1.29 accident per km.
Poland and Slovakia have
undertaken to build such
link through an
intergovernmental
agreement since the
proposed section is also
part of the TEN-T basic
network. The section will
reduce travel time between
the Žilina region and
Bielsko-Biala, Poland. It
should improve the
environment


The drafted Strategic Plan for Transport Infrastructure Development in Slovakia until 2020 (Master Plan) identifies the following sections of highways, expressways and 1 class roads as necessary:
st
Transportation Corridors and D1 Bratislava - Ministry of Transport, Construction involves Yes Obtain relevant 0.66 TBD RISKS OF TECHNICAL
missing links Senec, Construction and Regional modification of the section’s building permits PROPOSAL
extension to Development of the Slovak parameters in compliance 2015 (Construction Permit
6 lanes Republic with STN standards to documentation is
become a satisfactory 6- Launch tender for currently being prepared
lane highway with main construction with the deadline for
emergency lanes that would work handover in February
replace the current 2015 2015).
temporary road whose RISK OF PUBLIC


25