Country : Portugal
Project list
DISCLAIMER:
• Given the present constraints, the list is not a firm commitment, but represents the best information as of today
• There was an effort to make the list, as comprehensive and information rich as possible, in a short period of time which means that some details may be object of review, later on. It is not a firm commitment
• This is an assortment of projects, not an extensive list,
• A compilation of private investments was integrated on the list as insight to private investment trends. For confidentiality reasons those are given in aggregate terms.
Sector Subsector Private/Public Project name Implementing national Description Included in Status Total invest-ment Investment in Barriers/solutions
/PPP agency national cost (EUR bn) 2015 – 2017
investment (EUR bn)
plan (yes/no)

2. Energy Union iv. Connections and 1. Private Hydro Pump Private Promoter/ Hydro Pump Storage Project, located in one of the poorest In Preconstruction 0.434 0.187
production Storage Girabolhos Ministry of Environment and regions of the country, in the municipalities of Seia, Gouveia, Stage (construction
(electricity) Energy Mangualde and Nelas. This project is relevant to fulfil the of access and setup
purpose of accommodating further non manageable renewable works)
energies avoiding fossil consumption. Relevant also for water
storage. Direct creation of 1.000 jobs during peak construction
period.
2. Energy Union iv. Connections and 1. Private 3rd interconnection Private Promoter/ Construction of a new interconnection between Portugal and Yes Study/ preparation 0.266 0.135 E+K51nvironmental impact assessment
production (natural Portugal-Spain Ministry of Environment and Spain.
gas) Energy
2. Energy Union iv. Connections and 1. Private Smart grids Private Promoter/ Smart grids and smart meters Yes Under study 0.600 0.600
production (natural Ministry of Environment and
gas) Energy
2. Energy Union iv. Connections and 1. Private Carregado Private Promoter/ Construction of a compression station with 14 MW, capable of Yes Study/ preparation 0.025 0.019
production (natural Compression Ministry of Environment and handling flow rates of the order of 650 000 m3/h. Will enhance
gas) Station Energy the ability of the transportation section of the main pipeline
between Sines and Leiria, in order to allow the flow of a stream
of higher gas originating in Sines LNG Terminal.
2. Energy Union iv. Connections and 1. Private Pipeline Carriço Private Promoter/ Construction of a 60km gas pipeline between Carriço Yes Study/ preparation 0.045 0.001 Environmental impact assessment
production (natural Cantanhede Ministry of Environment and underground storage and Cantanhede will increase the security
gas) Energy of gas supply to the combined cycle natural gas power plants in
the central region of Portugal, will provide the gas transport
network of a second alternative access to Carriço underground
storage.
2. Energy Union iv. Connections and 1. Private Delivery Points and Private Promoter/ Construction of new GRMS and other delivery points Yes Study/ preparation 0.016 0.010
production (natural other projects Ministry of Environment and
gas) Energy
2. Energy Union iv. Connections and 1. Private Underground Private Promoter/ Construction of the 6th cavity at the Carriço Complex Yes In the commissioning 0.044 0.003
production (natural Storage Ministry of Environment and phase
gas) Energy
2. Energy Union iv. Connections and 1. Private Underground Private Promoter/ Construction of the 8th cavity at the Carriço Complex. Yes Study/ preparation 0.049 0.019 Environmental impact assessment
production (natural Storage Ministry of Environment and Optimization and upgrade of the gas station for injection /
gas) Energy extraction and gas safety improvements
2. Energy Union iv. Connections and 1. Private Underground Private Promoter/ Construction of the 7th and 9th cavity at the Carriço Complex Yes Study/ preparation 0.073 0.017 Environmental impact assessement
production (natural Storage Ministry of Environment and
gas) Energy
2. Energy Union iv. Connections and 1. Private LNG Terminal Private Promoter/ Frequency inverters, adaptation of the jetty to accommodate Yes Study/ preparation 0.029 0.008
production (natural Ministry of Environment and vessels up to 40.000m3 and other safety improvements.
gas) Energy
2. Energy Union iv. Connections and 1. Private Natural Gas Private Promoter/ Development of the natural gas distribution network Yes Study/ preparation 0.105 0.062
production (natural Distribution Ministry of Environment and
gas) Network Energy
2. Energy Union iv. Connections and 1. Private Natural Gas Private Promoter/ Other projects Yes Study/ preparation 0.023 0.014
production (natural Distribution Ministry of Environment and
gas) Network Energy
2. Energy Union iv. Connections and 1. Private Natural Gas Private Promoter/ Development of the natural gas distribution network Yes Study/ preparation 0.014 0.004
production (natural Distribution Ministry of Environment and
gas) Network Energy
2. Energy Union iv. Connections and 1. Private Natural Gas Private Promoter/ Development of the natural gas distribution network Yes Study/ preparation 0.013 0.008
production (natural Distribution Ministry of Environment and
gas) Network Energy
2. Energy Union iv. Connections and 1. Private Natural Gas Private Promoter/ Development of the natural gas distribution network Yes Study/ preparation 0.098 0.062
production (natural Distribution Ministry of Environment and
gas) Network Energy
   120   121   122   123   124   125   126   127   128   129   130