Country : Luxembourg
Project list

Private/Publi Included in Investment in 2015
Sector Subsector Project name Implementing agency Description national Status Total invest-ment cost – Barriers/solutions
c/ PPP
investment (EUR mn) (EUR mn)

Energy efficiency Lending facility to facilitate energy Small Luxembourg market makes it difficult to
Energy Union public private Klimabank MoF/MinEco Yes planning 300 1 attract funds. Corporate Banks do not engange
in buildings efficiency measures for
households in energy efficiency related lending.

Improve energy efficiency in buildings
Energy Union Energy efficiency public School MDDI serving educational purposeses (currently Yes planning and partly under 457 329
in buildings modernisation/en construction
ergy efficiency 18 specific projects identified)




The aim of the project is to strengthen the
high voltage network and to guarantee
electrical power supply of Luxembourg.The

project envisions the realization of an
interconnection between Luxembourg and
Belgium allowing to increase the transfer
capability between LU, DE, BE and FR

and contributing to the security of supply of
both countries. Loop around Luxembourg
The interconnection is realized in two steps
Connections Luxembourg- - On short-term (2016) a phase shift City is under construction,
Energy Union private Creos Luxembourg No Phase shift transformer 163 32
and Belgium transformer is integrated and connected to ordered and should go in
production Interconnector existing overhead line via an additional operation end of 2015
cable, in order to control the transit flows
from Germany to Belgium
- On longer-term (2020) a solution with
cables is under study envisioning a 1000
MVA path between Belgium and
Luxembourg
In parallel a 1000 MVA reinforcement of
the internal Luxembourg network is being
constructed in order to create a loop
around Luxembourg city, including
substations for in feed in lower voltage
levels.


The projects aims at implementing wood
energy on a large scale in Luxembourg,

inceasing energy efficency and security, Lack of financial means, and return on invest.
Connections Déploiement de reducing risks of climate change, and Massive deployment could increase experience
Energy Union public private MinEco positively impacting employment. The No development ongoing 36 5 and reduce future investment costs and increase
and chaudières à projects aims at devlivering wood energy acceptance of new technology.
production énergie-bois
related infrastructure on the local level and
within enterprises. Ordre of magnitude: 0-
1MW per installation, 100 installations.

Natural Beggen; collecteur MDDI-Département
Resources and Environment resources: public wastewater treatment project Yes 85% 93 12
efficient and Bonnevoie- de
secure Beggen l'environnement

Natural Agrandissement, MDDI-Département
Resources and Environment resources: public wastewater treatment project Yes 6% 46 26
efficient and modernisation STEP de
secure SIDEN à Bleesbruck l'environnement
Heiderscheidergrund (y
Natural compris assainissement du MDDI-Département
Resources and Environment resources: public Lac de la Haute-Sûre, de wastewater treatment project Yes 73% 59 9
efficient and réseau de collecteur) l'environnement
secure

Assainissement de la vallée
Natural de l'Attert MDDI-Département
Resources and Environment resources: public Système de collecteur - de wastewater treatment project Yes 10% 58 23
efficient and phase 2 l'environnement
secure + surcoût phase 1 5)
availability