No. Sector Subsector Private/Public/ Project name Implementing Description Included Status Total investment Investment in Intended Barriers/ solutions Planned start Planned
PPP agency in national cost 2015 – 2017 for EU of completion
investment Funds implementatio date (year)
plan (yes / no) n (year)
(yes/no) (EUR mil) (EUR mil)
64 Energy Union Connections and Public HES Kosinj / HE Senj 2 HEP d.d. On the basis of complete and comprehensive analysis defined the optimal solution for Yes In preparation 600 60 No
production the further development of HES Senj which is achieved by: increasing strength and
power generation, flood control and increase agricultural production areas
downstream of Lake Denison, safe water supply of the North coast that this project
provides a multifunctional character, increases the regulated removal of high waters of
Lika in the Adriatic Sea.
65 Energy Union Connections and Public TE Plomin C HEP d.d. Replacement Facility TEP C, with the associated infrastructure, is located on an Yes In preparation 810.7 81.07 No
production existing building plot of Plomin thermal power plant. The location is mostly located in
the municipality Kršan, to a lesser extent (the coastal edge of the Plomin Bay) in the
town of Labin.
TEP C is envisaged by the concept of modern power plants of pure coal technologies
with a view to modernizing will improve the situation from the standpoint of
environmental impact at a number of aspects.
TEP C is constructed as the condensing block of 500 MW at the generator terminals
combustion of coal dust in space and supercritical steam condition of 30 MPa and
600 ° C, with one intermediate steam at 610 ° C. In the selection of technical solutions
there have been analyzed numerous solutions of similar plants in the world and as a
reference plant was selected Torrevaldaliga power plants in Italy.
Replacement TEP C will produce electricity with 25 percent less fuel per kWh of
Plomin 1
TEP C will produce 3,600 GWh of electricity to the consumption of 1.1 million tons of
coal annually. For the supply of coal will be used existing wharf for coal.
The construction of TEP C reduces air emissions from the site and improves the state
of the environment thanks to a new, modern solutions.
66 Energy Union Connections and Public TE Rijeka HEP d.d. TE Rijeka became operational in 1979 and is located in front of the end-of-life duration Yes In preparation 306.7 30.67 No
production and need to find the best solution for the revitalization of existing or construction of
new power plants. Fuel oil used as fuel becomes increasingly difficult and increasingly
difficult deliverable meets the criteria of environmental protection, thus jeopardizing
readiness, availability and reliability TE Rijeka. The current state of emissions into the
environment is such that the results of measurements of the plant can be operated up
to 2017 years, after that do not meet the IPPC Directive (Directive 2010/75 / EU of
24.11.2010.). As an alternative fuel for the new plant is planned natural gas pipeline
must be the local lead of IAS River-east to the location of TPP Rijeka. A new unit of
the river will have installed capacity of between 300 and 600 MW with investment
value of 300 million euros. The envisaged role of future TE Rijeka in the Croatian
electric power system is working at peak regimes and engagement than 4,000 hours
of work per year. One option provides for the construction and production of heat
energy required by INA Rijeka refinery. The project is at an early stage of development
where they discussed various embodiments of the installed capacity and the amount
of heat energy for the needs of industrial consumers.
67 Energy Union Connections and Public VHS Osijek HEP d.d. VHS Osijek is a multipurpose hydro-technical system, which would be performed at Yes Idea 346.7 34.67 No
production the Osijek-Baranja County, in the lower course of the river Drava in the area between
the City of Osijek and the upstream profile on which this river becomes the border
watercourse. This procedure on the best way to harmonize environmental protection
of water (flood, erosion of shores and drainage of riparian waters) and conditions of
use water of the river Drava (for food production, water supply, navigation, power
generation, protection and restoration of natural habitats, and for sport and recreation).
68 Energy union Energy efficiency public / private Programme of energy reconstruction FZOEU Measures to improve energy efficiency in households. The objectives of this program Yes In implementation 577.5 82.5 Yes 2014 2020
in buildings of family houses 2014 - 2020 are the identification and analysis of energy consumption and energy efficiency of the
existing housing stock, to identify the potential and possibilities of reducing energy
consumption in existing residential buildings, working out the implementation of
measures to encourage improvements in energy efficiency in existing residential
buildings and to assess their impact. The program is focused on improving the energy
performance of existing buildings and measures can be grouped into three groups:
encouraging the renewal of the outer shell (increasing the thermal protection of the
69 Energy union Energy efficiency public / private Programme of energy renovation of FZOEU outer shell, window replacement), encouraging the replacement of the heating system Yes In implementation 560 240 Yes 2014 2020
in buildings residential buildings 2014 - 2020 (replacement of existing heating systems that use electricity or fossil fuels, new
systems with condensing gas boilers) and encouraging the use of renewable energy
(installation of solar thermal collectors, installation of heat pumps and the installation of
small biomass stoves)
70 Energy union Energy efficiency public / private Programme of energy renovation of FZOEU Commercial non-residential buildings in Croatia can be defined as building the Yes In preparation 525 225 Yes (in part) Lack of co- funding 2015 2020
in buildings commercial non-residential buildings business and service characters, including office and commercial buildings (shops,
2014 - 2020 wholesalers, dealers, retail warehouses), hotels and other tourist facilities, restaurants,
catering facilities, banks etc. The Programme of energy renovation of commercial non-
residential buildings will be applied to economically justified energy efficient
technologies and measures in non-residential buildings for commercial purposes in
order to develop new business and entrepreneurship, continuous and systematic
energy management, strategic planning and sustainable management of energy
resources at the national, regional and local level.